Abraj Al AzlContracting
Call العربية
White insulated dome on a roof among the houses

Ceramic roof coating in Udhailiyah

Reflects and protects

A protective reflective ceramic coat over the existing roof surface, shielding the concrete and easing heat

+966 54 311 2066
The service in your area

Ceramic roof coating in Udhailiyah

Ceramic roof coating in Udhailiyah begins with a photo of the roof, sent by call or WhatsApp. The town lies near Al Matar District and Imam Muhammad Ibn Saud Islamic University, with roofs ranging from homes to newer buildings.

Udhailiyah includes scattered homes and newer buildings near the university and Al Matar District, with roofs ranging from older exposed concrete to recently renovated ones. A reflective coating eases the heat on concrete in summer, but it relies on a sound surface and well-bonded layers. The photos are reviewed to establish what each roof actually needs.

  • Udhailiyah is a town in the Eastern Province, near Al Uthmaniyah, Al Matar District and Imam Muhammad Ibn Saud Islamic University.
  • Old layers that no longer bond well may need partial removal before a new layer is applied.
What the service includes

The scope of the work in Udhailiyah

  • Closing the coat around drain openings and any transition points
  • Turning the coat up at the parapet, AC bases and tank stands
  • Treating visible hairline cracks and joints
  • Checking the roof surface and assessing whether a ceramic coat fits
How we work

This is how we work in Udhailiyah

1

Send photos of the roof

On WhatsApp: photos of the whole roof, any visible cracks, the AC bases, the parapet and the drains, so we can read the surface and confirm a ceramic coat fits this roof.

2

Clean the surface and treat the cracks

The surface is cleaned of dust, dirt and any grease, and hairline cracks and joints are treated before the coat goes on, so it bonds properly to an even surface.

3

Apply the protective coat

The coat is applied over the whole surface, turned up at the parapet and taken around the AC bases, tank stands and drain openings, depending on the material and the surface condition.

4

Cure and set

The coat is left to dry and cure in the open air. Once set, the surface is ready for use and the layer begins reflecting radiation and protecting the concrete beneath.

What sets us apart

Why Abraj Al Azl?

Less heat inside the buildingA slab that reflects rather than absorbs radiation passes less heat to the room below, easing the load on the cooling system.

Start from Udhailiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Udhailiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book ceramic roof coating in Udhailiyah

Must old coating be removed before a new one in Udhailiyah?

Not always, as a well-bonded old layer may be enough. If it is peeling or breaking up, it is partly removed before the new coat goes on.

Does the coating suit the buildings around the university in Udhailiyah?

It suits concrete roofs generally, and the photos show its fit for each building. We make no promises before reviewing them.

What decides the cost of coating a roof?

The roof area, its condition, the number of visible cracks, whether it needs heavy cleaning first, and how the site is reached. Send us photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Do you offer ceramic roof coating in Udhailiyah?

Yes. Udhailiyah is within our service area in the Eastern Province, and we also work in Al Uthmaniyah, Al Matar District and Imam Muhammed Ibn Saud Islamic University District. Call us or send photos of the spot on WhatsApp.

Is a ceramic coat suited to a hot climate?

Yes. The intense heat and the large gap between day and night temperatures are exactly what opens hairline cracks and stresses the concrete in this region. A reflective coat reduces the effect of direct sun on the slab, and is the choice that suits a sound roof in this climate.

Do AC bases need special treatment when the coat is applied?

Yes. AC bases are a common weak point because the joint between the base and the concrete moves with heat. When the coat is applied those joints are treated and the coat is raised around each base to close any gap that could let water in.

Nearby areas

The same service in nearby areas

We also work near Udhailiyah, in Al Uthmaniyah, Al Matar District and Imam Muhammed Ibn Saud Islamic University District.

Other services in the area

More services in Udhailiyah

Indoor mosaic-tiled pool

Ceramic roof coating in Udhailiyah?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp