Abraj Al AzlContracting
Call العربية
Empty seaside pool during waterproofing

Pool waterproofing in Qurtubah (near Inak)

Water stays in the pool

Waterproofing for concrete pool shells from the inside, before and after tiling

+966 54 311 2066
The service in your area

Pool waterproofing in Qurtubah (near Inak)

A pool in Qurtubah is waterproofed on the concrete shell from inside, before and after tiling, and the process starts with a photo sent by call or WhatsApp. The photos show whether the whole basin needs coating or only specific points need treatment.

The district has houses and villas of varied sizes, and pools range from small courtyard basins to larger ones. Leaks usually show at corners, at the joint between wall and floor, and around drains and fittings. Where tiling is recent, dampness may be hidden beneath it, so the review starts from the photos before any decision.

  • Qurtubah is a residential district in Dammam in the Eastern Province, close to Al Naseem, At Tif and Al Khisab.
  • Corners and wall-to-floor joints are the points in a basin most prone to cracking over time.
What the service includes

What we do for you in Qurtubah (near Inak)

  • Applying the layer that suits the condition of the surface
  • Checking the shell walls, floor and corners
  • Leaving the layer to cure before refilling or tiling
  • Treating cracks, joints and fitting openings
How we work

How we carry out pool waterproofing in Qurtubah (near Inak)

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.

2

Inspect the shell and locate the points

The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.

3

Prepare the surface and treat the cracks

The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.

4

Apply the layer and let it cure

The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.

What sets us apart

Why Abraj Al Azl?

Water finds no way through the shellA continuous layer closes the cracks, the openings and the joints together, so the water has no path through the shell after treatment.

Your request from Qurtubah (near Inak) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Qurtubah (near Inak) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Two workers in high-visibility vests insulating a roof beside the AC units
Round water tank lined in blue inside, with a float in the middle

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing in Qurtubah (near Inak)

Is treating a single spot enough for a pool in Qurtubah?

That depends on where the leak is and how far it spreads. If damage is confined to one point and the shell is sound, repairing that point may suffice; otherwise treating the whole basin is better. The photos will decide.

How is a tiled pool in Qurtubah inspected before waterproofing?

We start with photos of the tiles, their edges and any damp patches around drains and fittings. These show where the dampness begins, and from them we determine whether any tiling needs lifting.

What should I send you from Qurtubah (near Inak)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Qurtubah (near Inak), and we will work out the next step with you.

Does the pool have to be emptied before the work starts?

In most cases yes, because the waterproofing needs a dry clean surface that can be inspected and prepared. Some crack injection materials work under water, but the final decision depends on the case and where the leak is. Send photos and we will tell you what needs to be prepared before the work starts.

Can a tiled pool be waterproofed without lifting the tiles?

In some cases yes, if the leak is limited to the joints or around a specific fitting. But if the concrete shell beneath the tiles is the source, lifting the tiles in certain areas may be needed. Photos and inspection decide that; there is no single answer that fits every pool.

What materials are used for pool internal waterproofing?

Common materials include flexible cementitious coating that holds up under permanent moisture, liquid membrane that forms in place and covers corners and fittings easily, and crack injection materials. The choice depends on the condition of the shell and whether the work is before or after tiling.

Nearby areas

Areas near Qurtubah (near Inak)

We also work near Qurtubah (near Inak), in Al Naseem, At Tif and Al Khisab.

Other services in the area

More services in Qurtubah (near Inak)

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Qurtubah (near Inak)
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp