Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Qurtubah (near Inak)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Qurtubah (near Inak)

We waterproof pools before tiling them in Qurtubah, Al Khobar, starting with the concrete shell, corners, joints and pipe inlets before adhesive and tiles are fitted. Send photos of the pool by call or WhatsApp and we will decide the next step with you.

The district has houses and villas of varied age and garden size, so some pools have older shells and others are newly built. Older pools often show hairline cracks at joints and around pipes, while newer ones usually need their surface prepared before tiling. Work therefore starts with checking the concrete, and then the right treatment is set for each part of the pool.

  • Qurtubah is a residential district in Al Khobar in the Eastern Province, lying close to Al Naseem, At Tif and Al Khisab.
  • Hairline cracks at joints are the first sign in an older pool, and they are hidden once it is tiled.
What the service includes

What we do for you in Qurtubah (near Inak)

  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
  • Applying the waterproof layer across the floor, walls and pool rim
  • Checking the layer is complete before tiling is allowed to begin
How we work

How we carry out pool waterproofing before tiling in Qurtubah (near Inak)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Your request from Qurtubah (near Inak) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Qurtubah (near Inak) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing before tiling in Qurtubah (near Inak)

Is an older pool in Qurtubah checked before tiling?

Yes, the shell is checked first, because any fault under the tiles is hard to reach later. The photos show whether the structure is sound.

What is needed before tiling a newer pool in Qurtubah?

The surface is prepared and the corners and joints are treated, then adhesive and tiles go on. We agree this after reviewing photos of the pool and its surroundings.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

What should I send you from Qurtubah (near Inak)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Qurtubah (near Inak), and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Qurtubah (near Inak), the same service is available in Al Naseem, At Tif and Al Khisab.

Other services in the area

More services in Qurtubah (near Inak)

Mosaic-tiled seaside pool

We start with you in Qurtubah (near Inak)
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp