Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Sinaiyah Al Fawaziyah

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Sinaiyah Al Fawaziyah

Pool waterproofing before tiling in Sinaiyah Al Fawaziyah begins with WhatsApp photos of the floor, walls and corners. The district has industrial and commercial buildings with pools in hotels and sports facilities, each needing precise concrete treatment before tiles are laid.

Sinaiyah Al Fawaziyah has modern hotels and sports facilities with newly built pools, and recently poured concrete undergoing pre-tiling treatment often shows moisture or minor cracks at joints. The joints between the pool floor and side walls and the inside corners are critical areas where water seeps easily. Treating pipe joints and inlets before tile adhesive is applied stops water leaking from under the surface layer. The photos you send show the concrete condition, the joints and how much treatment is needed.

  • Sinaiyah Al Fawaziyah is a district in the Eastern Province, close to Ibn Sina, Al Iskan and As Sahil, with commercial and industrial facilities concentrated there.
  • Newly poured concrete before tiling can retain internal moisture, so it must be sealed comprehensively to prevent tile cracking and bond failure.
What the service includes

The main items of pool waterproofing before tiling in Sinaiyah Al Fawaziyah

  • Cleaning the surface and removing casting residue and dust
  • Inspecting the concrete and locating cracks and hairline cracks
  • Applying the waterproof layer across the floor, walls and pool rim
  • Treating corners and pour joints with a suitable compound
How we work

How we carry out pool waterproofing before tiling in Sinaiyah Al Fawaziyah

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

We serve Sinaiyah Al Fawaziyah and around itIncluding Ibn Sina, Al Iskan (near Al Khobar) and As Sahil (near Al Khobar), as part of our work across the Eastern Province.

Pool waterproofing before tiling in Sinaiyah Al FawaziyahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in Sinaiyah Al Fawaziyah

When should a pool concrete be treated before tiling?

Right after the concrete is poured and before tiling starts. Early treatment stops water leaking through hairline cracks and joints. Send photos of the floor and corners so we can decide the right timing with you.

Is treating the joints enough or must the whole floor be sealed?

It depends on the concrete condition. If it is sound, treating joints and corners may be enough; if cracks appear, broader sealing is needed. Photos show us what is required.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Is Sinaiyah Al Fawaziyah within your service area?

Yes, Sinaiyah Al Fawaziyah is one of the areas we work in, as are Ibn Sina, Al Iskan (near Al Khobar) and As Sahil (near Al Khobar). To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

We also work near Sinaiyah Al Fawaziyah, in Ibn Sina, Al Iskan (near Al Khobar) and As Sahil (near Al Khobar).

Other services in the area

More services in Sinaiyah Al Fawaziyah

Mosaic-tiled seaside pool

In Sinaiyah Al Fawaziyah and need pool waterproofing before tiling?
Send us photos of the spot

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp