Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Sinaiyah Al Fawaziyah

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Sinaiyah Al Fawaziyah

Cementitious pool waterproofing in Sinaiyah Al Fawaziyah begins with photos of the pool sent by call or WhatsApp. The flexible cement coating covers the pool walls and floor, protecting the concrete and holding the tiles in place. Industrial districts have pools in worker compounds and commercial facilities.

Pools in industrial areas serve many workers and staff, exposed to heavy use and intense heat. Concrete cracks from expansion and contraction, and tiles come loose without strong waterproofing. The cement coating fills gaps and stops leaks through joints and cracks. Photos show the tile condition and any existing cracks, so we can choose the right coating thickness and preparation.

  • Sinaiyah Al Fawaziyah is a district in the Eastern Province, near Ibn Sina, Al Iskan and As Sahil.
  • Industrial pools face direct sun and chlorine, which stresses joints and tiles.
What the service includes

What we do for you in Sinaiyah Al Fawaziyah

  • Treating hairline cracks and the wall-to-floor junction
  • Applying the flexible cementitious layer over the whole shell
  • Cleaning the concrete surface and removing any adhesive residue or dust
  • Checking the pool walls and floor and locating cracks and openings
How we work

This is how we work in Sinaiyah Al Fawaziyah

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Start from Sinaiyah Al Fawaziyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Sinaiyah Al Fawaziyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on cementitious pool waterproofing in Sinaiyah Al Fawaziyah

Does the cement coating hold existing tiles or must they be replaced?

If the tiles are sound, the coating holds and protects them. If tiles are badly cracked or loose, the photos will show it, and we may need to replace damaged sections before coating.

When can the pool be used after cementitious waterproofing in Al Fawaziyah?

This depends on the climate and humidity at the site. The photos and inspection help us tell you when the pool can be refilled.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

How do I know if the concrete is ready for the cementitious coating?

The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Do you offer cementitious pool waterproofing in Sinaiyah Al Fawaziyah?

Yes. Sinaiyah Al Fawaziyah is within our service area in the Eastern Province, and we also work in Ibn Sina, Al Iskan (near Al Khobar) and As Sahil (near Al Khobar). Call us or send photos of the spot on WhatsApp.

Nearby areas

Cementitious pool waterproofing near Sinaiyah Al Fawaziyah

If the site is outside Sinaiyah Al Fawaziyah, the same service is available in Ibn Sina, Al Iskan (near Al Khobar) and As Sahil (near Al Khobar).

Other services in the area

More services in Sinaiyah Al Fawaziyah

Empty seaside pool during waterproofing

Cementitious pool waterproofing in Sinaiyah Al Fawaziyah?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp