
Pool waterproofing before tiling in Shari
Pool waterproofing before tiling in Shari starts with photos of the pool floor, joints, corners and cavities sent by call or WhatsApp. The village has simple homes and varied villas, often with small pools needing protection before tile installation.
Shari mixes simple old homes with newer villas, with pools of varying size and condition. Older pools may show many cracks and slow seeps at corners and pipe entries, while newer pools may need only basic joint treatment. The area's intense heat and dryness make concrete prone to slow cracking and shrinkage, and moisture may appear on walls near damp soil. Clear photos help pinpoint weak spots precisely before tiling.
- Shari is a village in the Eastern Province, close to Abu Koola, Salasil and Usayfirat.
- Pools in villages face extreme unshaded heat, so concrete cracks slowly and joints weaken over time and seasons.
What we do for you in Shari
- Checking the layer is complete before tiling is allowed to begin
- Applying the waterproof layer across the floor, walls and pool rim
- Treating corners and pour joints with a suitable compound
- Inspecting the concrete and locating cracks and hairline cracks
This is how we work in Shari
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Your request from Shari comes to usCall or WhatsApp on one number, and we answer you ourselves.
Shari is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
Before you book pool waterproofing before tiling in Shari
What are the most common problems in old Shari pools?
Fine cracks in the pool floor and corners, slow seeps at drain and suction pipe entries, and there may be rising soil moisture. Photos clearly show the problems and we choose the most suitable solution.
Should pool joints be treated even if they look sound?
Yes, because heat and dryness cause slow movement in joints that may not be visible. Early treatment stops water entering before seepage begins under tiles.
Do you cover Shari?
Yes. We serve Shari and nearby areas such as Abu Koola, Salasil and Usayfirat, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
What materials are used to waterproof a pool shell before tiling?
Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.
How long must the waterproof layer cure before tiles go on?
It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.
Why is the pool shell waterproofed before tiling and not after?
Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.
More services in Shari

