
Cementitious pool waterproofing in Shari
Cementitious pool waterproofing in Shari starts with WhatsApp photos of the pool from different angles. The village has simple private pools in small houses and villas facing slow cracks and repeated water leaks. The flexible cement coating restores proper sealing and bonds tiles firmly to concrete.
Shari pools are small and simple, mostly open to the air almost year-round. The concrete faces intense daytime heat and relative night cold, causing cyclic stress that leads to small horizontal and vertical cracks. Tiles lose grip gradually, and water slowly seeps into gaps below the surface. The flexible cement coating fills cracks and creates a continuous protective layer that tolerates heat swings. Photos reveal major weak points and visible leaks before treatment begins.
- Shari is a village in the Eastern Province, near Abu Koola and Salasil, with small houses and villas.
- A small pool in simple villages suffers periodic water leaks, and robust fresh coating stops seepage for a long time.
The scope of the work in Shari
- Applying the flexible cementitious layer over the whole shell
- Cleaning the concrete surface and removing any adhesive residue or dust
- Closing return pipe openings and drain outlets before the coating goes on
- Checking the pool walls and floor and locating cracks and openings
The stages of the work in Shari
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
Start from Shari with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Shari comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book cementitious pool waterproofing in Shari
Does cement coating prevent all leaks in Shari's old pools?
New coating stops leaks through existing cracks and separations if properly applied. But if the concrete itself is very badly damaged, photos will show that before we start, and additional treatment may be needed.
How long does cement coating take to dry after application in Shari's weather?
Drying depends on temperature, humidity and ventilation. Photos and instructions after completion will show you next steps. We cannot state a fixed time before knowing the pool's actual conditions.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
How do I request cementitious pool waterproofing in Shari?
Call us, or send clear photos of the spot and its location in Shari on WhatsApp, and we will work out the next step with you.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Why is the cementitious coating kept moist after it is applied?
Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.
More services in Shari
