Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Salwa

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Salwa

Pool waterproofing before tiling in Salwa begins with photos of the pool shell, its corners and joints, sent by call or WhatsApp. The village is made up of houses and private homes, where the pool is often part of a courtyard or back garden.

Homes in Salwa are usually standalone houses on fairly wide plots, and pools there are typically built in concrete in the back yard. Before tiling, the corners, joints and pipe inlets must be treated, because any gap beneath the tiles shows later as a leak. The photos show whether the shell is sound or needs its cracks treated first.

  • Salwa is a village in Al-Ahsa within the Eastern Province, lying close to Mehdar and As Sikak.
  • A concrete pool shell not treated before tiling most often leaks at its joints and corners.
What the service includes

What the service covers in Salwa

  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
  • Closing feed and drain pipe inlets and light fitting openings
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

This is how we work in Salwa

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Salwa is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Salwa and around itIncluding Mehdar, As Sikak and Al Batha, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in Salwa

Can a pool in Salwa be waterproofed if the tiles are already laid?

It depends on the tiles and what lies beneath them, and the photos alone will show that. Treating the shell before tiling is usually best; if tiles are already in place we will tell you what is possible.

What does pool waterproofing need in a house with a back yard?

It needs the pipes, inlets and access to the pool edge identified. Send a photo of the back yard with the pool and we will plan the sequence with you.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

How do I request pool waterproofing before tiling in Salwa?

Call us, or send clear photos of the spot and its location in Salwa on WhatsApp, and we will work out the next step with you.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Nearby areas

Pool waterproofing before tiling near Salwa

We also work near Salwa, in Mehdar, As Sikak and Al Batha.

Other services in the area

More services in Salwa

Mosaic-tiled seaside pool

In Salwa and need pool waterproofing before tiling?
Send us photos of the spot

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp