
Pool waterproofing before tiling in As Sikak
Pool waterproofing before tiling in As Sikak starts with photos of the basin, its corners and the pipe inlets, sent by call or WhatsApp. As Sikak is a small hamlet close to Salwa, Mehdar and Al Batha, where villas and farm plots on wide land are the usual setting.
Small villages in this area include villas and farms, many with concrete pools poured on site years ago. Such old basins often show cracks at the corners, the joints and around the pipe inlets, which is where leaks usually begin. Because pools here can sit well away from utilities, the photos and a call establish the condition before any lining method and tiling are chosen.
- As Sikak is a small hamlet in the Eastern Province, close to Salwa, Mehdar and Al Batha, dominated by villas and farms.
- A concrete basin built on site often varies in wall thickness, and its corners are usually the weakest point when the surface is prepared.
The main items of pool waterproofing before tiling in As Sikak
- Cleaning the surface and removing casting residue and dust
- Checking the layer is complete before tiling is allowed to begin
- Applying the waterproof layer across the floor, walls and pool rim
- Treating corners and pour joints with a suitable compound
This is how we work in As Sikak
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.
Your request from As Sikak comes to usCall or WhatsApp on one number, and we answer you ourselves.
Pool waterproofing before tiling in As SikakWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in As Sikak
Can an old pool basin in As Sikak be waterproofed before tiling?
In many cases yes, provided the concrete is solid. Cracks, corners and pipe inlets are treated first, then the membrane goes down before the tile adhesive; if cracks run through the structure, the photos will show it.
Do you work on villa and farm pools in As Sikak?
Yes, we serve As Sikak. Send photos of the basin and tell us whether the pool is in a villa or a farm, so we can plan access and the order of work together.
Why is the pool shell waterproofed before tiling and not after?
Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
How do I request pool waterproofing before tiling in As Sikak?
Call us, or send clear photos of the spot and its location in As Sikak on WhatsApp, and we will work out the next step with you.
How long must the waterproof layer cure before tiles go on?
It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.
More services in As Sikak


