Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Qurtubah (near Qaryah al Ulya)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Qurtubah (near Qaryah al Ulya)

Pool waterproofing before tiling in Qurtubah begins with clear photos of the pool and its condition sent by WhatsApp or call. The district has villas and apartment buildings with private pools of various ages, and concrete condition varies by usage.

Private pools in Qurtubah villas and apartments face challenges from intense heat and constant humidity. Cracks and leaks appear regularly at corners, around pipes and in joints. Before tiling begins, these areas must be carefully treated to avoid problems later. Photos show crack size and location and help plan precise treatment before any work.

  • Qurtubah is a residential district in Al-Ahsa in the Eastern Province, near Al Wahah, Az Zuhur and Al Muruj, with villas and apartment buildings.
  • Interior corners of pools are naturally weak points and require special treatment before tiling.
What the service includes

What the service covers in Qurtubah (near Qaryah al Ulya)

  • Treating corners and pour joints with a suitable compound
  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
  • Closing feed and drain pipe inlets and light fitting openings
How we work

From first contact to the finished job in Qurtubah (near Qaryah al Ulya)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

We serve Qurtubah (near Qaryah al Ulya) and around itIncluding Al Wahah (near Qaryah al Ulya), Az Zuhur (near Qaryah al Ulya) and Al Muruj (near Qaryah al Ulya), as part of our work across the Eastern Province.

Pool waterproofing before tiling in Qurtubah (near Qaryah al Ulya)We choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Qurtubah (near Qaryah al Ulya)

What do you do if the concrete is heavily cracked?

We assess cracks from photos first. Small fine cracks we fill and seal. Deep large cracks may indicate a structural problem, and we will tell you the truth about the condition.

Do you treat very old pools?

Yes, but it depends on the concrete structure's condition. Photos show whether the concrete is sound. If it is, we treat it before tiling; if badly damaged, we will tell you so.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

What should I send you from Qurtubah (near Qaryah al Ulya)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Qurtubah (near Qaryah al Ulya), and we will work out the next step with you.

Nearby areas

The same service in nearby areas

If the site is outside Qurtubah (near Qaryah al Ulya), the same service is available in Al Wahah (near Qaryah al Ulya), Az Zuhur (near Qaryah al Ulya) and Al Muruj (near Qaryah al Ulya).

Other services in the area

More services in Qurtubah (near Qaryah al Ulya)

Mosaic-tiled seaside pool

Tell us about your site in Qurtubah (near Qaryah al Ulya)
and we will plan the next step with you

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp