Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Wahah (near Qaryah al Ulya)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Wahah (near Qaryah al Ulya)

We waterproof and prepare pool basins before tiling in Al Wahah, Hofuf, beginning from photos of the pool sent by call or WhatsApp. We treat the shell, corners, joints and pipe inlets, and then the tile adhesive and tiles are fitted.

The district is a mix of family homes and larger villas, with pools of varying sizes. Pools that are tiled without treatment usually leak through concrete joints, cracks around openings, and where walls meet the floor. Since each pool differs in age and how it was cast, the photos decide the treatment needed before any tiling.

  • Al Wahah is a district of Hofuf in the Eastern Province, close to Qurtubah, Ar Rabwah and Az Zuhur.
  • Where the wall meets the floor is one of the places pool leaks most often start under tiles.
What the service includes

The main items of pool waterproofing before tiling in Al Wahah (near Qaryah al Ulya)

  • Inspecting the concrete and locating cracks and hairline cracks
  • Applying the waterproof layer across the floor, walls and pool rim
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
How we work

How we carry out pool waterproofing before tiling in Al Wahah (near Qaryah al Ulya)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

We serve Al Wahah (near Qaryah al Ulya) and around itIncluding Qurtubah (near Qaryah al Ulya), Ar Rabwah (near Qaryah al Ulya) and Az Zuhur (near Qaryah al Ulya), as part of our work across the Eastern Province.

Your request from Al Wahah (near Qaryah al Ulya) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Wahah (near Qaryah al Ulya)

Why is the wall-to-floor junction treated before tiling a pool?

Because it is a frequent place for movement and cracking, and tiles do not protect concrete from water entering there. This area is treated as part of the waterproofing before adhesive goes on.

Do all pools in Al Wahah need the same treatment?

No, age, casting method and visible condition change what is needed. Send photos and we will agree with you what is required before work begins.

What should I send you from Al Wahah (near Qaryah al Ulya)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Wahah (near Qaryah al Ulya), and we will work out the next step with you.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Wahah (near Qaryah al Ulya), the same service is available in Qurtubah (near Qaryah al Ulya), Ar Rabwah (near Qaryah al Ulya) and Az Zuhur (near Qaryah al Ulya).

Other services in the area

More services in Al Wahah (near Qaryah al Ulya)

Mosaic-tiled seaside pool

In Al Wahah (near Qaryah al Ulya) and need pool waterproofing before tiling?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp