Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Maraj as Suban

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Maraj as Suban

We carry out pool waterproofing before tiling in Maraj as Suban, starting with photos of the pool shell, its corners and joints, sent by call or WhatsApp. The village has widely spaced homes and small farms, and its pools differ in shape and age.

The village has widely spaced homes and small farms, and its pools are usually built in the yard or within the farm, away from the road. An older concrete shell often shows cracks at the corners and joints, while a newer one generally needs its surface prepared before lining. The site is open to sun and wind, so the photos determine the concrete's condition before the right lining is selected.

  • Maraj as Suban is a village in the Eastern Province, near Al Kidadiyah, Khubayra' and As Sadawi, dominated by widely spaced homes and small farms.
  • A pool in an open site meets dust and wind as well as sun, so its surface must be cleaned thoroughly before lining.
What the service includes

The scope of the work in Maraj as Suban

  • Treating corners and pour joints with a suitable compound
  • Cleaning the surface and removing casting residue and dust
  • Applying the waterproof layer across the floor, walls and pool rim
  • Closing feed and drain pipe inlets and light fitting openings
How we work

This is how we work in Maraj as Suban

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Pool waterproofing before tiling in Maraj as SubanWe choose the method and the materials once we know the condition of the spot.

We serve Maraj as Suban and around itIncluding Al Kidadiyah (near Maraj as Suban), Khubayra' and As Sadawi, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing before tiling in Maraj as Suban

Are pools in Maraj as Suban cleaned before waterproofing?

Yes, the surface is cleaned and dried before the lining goes on so it bonds to the concrete. Tell us the pool's situation when you send photos so we can confirm the preparation it needs.

Can a pool on a farm in Maraj as Suban be waterproofed?

Yes, we serve Maraj as Suban. Send photos of the pool and its surroundings and tell us about the site, so we can plan access and the sequence of work with you.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Do you offer pool waterproofing before tiling in Maraj as Suban?

Yes. Maraj as Suban is within our service area in the Eastern Province, and we also work in Al Kidadiyah (near Maraj as Suban), Khubayra' and As Sadawi. Call us or send photos of the spot on WhatsApp.

Nearby areas

The same service in nearby areas

We also work near Maraj as Suban, in Al Kidadiyah (near Maraj as Suban), Khubayra' and As Sadawi.

Other services in the area

More services in Maraj as Suban

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Maraj as Suban?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp