Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Khubayra'

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Khubayra'

Pool waterproofing before tiling in Khubayra' starts with photos of the concrete shell sent by call or WhatsApp. The hamlet has scattered houses and villas on wide plots, many with private pools that need waterproofing before tiles and adhesive go on.

Pools in Khubayra' are private, built from reinforced concrete, and exposed to intense sun and extreme summer heat. Before tiling, hairline cracks must be treated where they form at corners, joints and pipe entries, as moisture seeps through them into the concrete. Proper waterproofing before tiles protect the structure from seepage and damage in the years ahead. Photos you send show the surface condition and cracks so we can choose the right treatment.

  • Khubayra' is a hamlet in the Eastern Province, close to Al Mahawa, Maraj as Suban and Umm ash Shifallah.
  • Untreated concrete in a private pool absorbs water, so it must be waterproofed before tiling to ensure the structure endures.
What the service includes

The pool waterproofing before tiling work in Khubayra'

  • Inspecting the concrete and locating cracks and hairline cracks
  • Treating corners and pour joints with a suitable compound
  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
How we work

From first contact to the finished job in Khubayra'

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

We serve Khubayra' and around itIncluding Al Mahawa, Maraj as Suban and Umm ash Shifallah, as part of our work across the Eastern Province.

Khubayra' is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in Khubayra'

Which cracks must be treated before a pool is tiled?

Hairline cracks at corners, joints and around pipe entries let water through. Photos show which cracks exist and their size, and we choose treatment based on that.

Can a pool be tiled right after the concrete is waterproofed?

The waterproofing needs time to dry fully before adhesive and tiles are laid. The hot conditions in Khubayra' speed drying, but you must wait for the right timing before the next stage.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Do you offer pool waterproofing before tiling in Khubayra'?

Yes. Khubayra' is within our service area in the Eastern Province, and we also work in Al Mahawa, Maraj as Suban and Umm ash Shifallah. Call us or send photos of the spot on WhatsApp.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

Pool waterproofing before tiling near Khubayra'

We also offer pool waterproofing before tiling in Al Mahawa, Maraj as Suban and Umm ash Shifallah, among the closest areas to Khubayra'.

Other services in the area

More services in Khubayra'

Mosaic-tiled seaside pool

Your first step in Khubayra':
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp