Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in King Khālid Military City

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in King Khālid Military City

Pool waterproofing before tiling in King Khālid Military City begins with photos of the concrete, corners and joints sent by call or WhatsApp. The town has residential compounds and military villas with private pools, and correct preparation before tiling ensures water does not leak through.

Pools in the military city's compounds serve families and need careful treatment before tiling. Concrete in these villas and buildings often shows heavy joints and cracks at corners due to extreme heat, so they must be treated before adhesive is applied. Pipe entries and channels need special care to prevent water seeping under the tiles. Photos show the concrete's condition and what treatment is needed.

  • King Khālid Military City is a town in the Eastern Province, near An Nayfiyah and Al Fiwan, with residential compounds and villas.
  • Concrete in hot desert climates tends to shrink and crack, so joints and cracks must be treated before tiling.
What the service includes

The scope of the work in King Khālid Military City

  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
  • Inspecting the concrete and locating cracks and hairline cracks
  • Applying the waterproof layer across the floor, walls and pool rim
How we work

How we carry out pool waterproofing before tiling in King Khālid Military City

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Your request from King Khālid Military City comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from King Khālid Military City with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in King Khālid Military City

Do military villas' pools in King Khālid Military City need special treatment?

Yes, intense heat and dryness cause concrete cracks. We treat these cracks and joints carefully before tiling to ensure lasting waterproofing. Send photos of the pool so we can assess what is needed.

Can an older pool in the city be repaired without removing the existing tiles?

If the leak is recent and the tiles are intact, some openings might be treated from inside. But for thorough waterproofing before retiling, the old tiles must come off first. Photos show which option fits your case.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Do you cover King Khālid Military City?

Yes. We serve King Khālid Military City and nearby areas such as An Nayfiyah (near King Khālid Military City), AL THIYBIA and Al Fiwan, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near King Khālid Military City

We also work near King Khālid Military City, in An Nayfiyah (near King Khālid Military City), AL THIYBIA and Al Fiwan.

Other services in the area

More services in King Khālid Military City

Mosaic-tiled seaside pool

We start with you in King Khālid Military City
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp