Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in AL THIYBIA

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in AL THIYBIA

Pool waterproofing before tiling in Al Thiybia starts with photos sent via WhatsApp or a direct call. The town has scattered houses and villas, many with private pools that need the concrete treated before tiles are laid.

Al Thiybia has pools of various sizes in villas and houses, with concrete prone to cracking from heat and moisture swings. The corners and joints between pool walls and floor are critical points where water seeps easily. Treating these areas and pipe inlets before tiling prevents damp and moisture later. Clear photos of the floor, walls and joints help us assess the concrete condition and identify areas needing extra care.

  • Al Thiybia is a town in the Eastern Province, close to Al Fiwan and King Khālid Military City, characterised by scattered houses and villas.
  • Fresh pool concrete needs time before tiling to dry and settle, and hairline cracks may appear during this period that require treatment.
What the service includes

The main items of pool waterproofing before tiling in AL THIYBIA

  • Closing feed and drain pipe inlets and light fitting openings
  • Inspecting the concrete and locating cracks and hairline cracks
  • Treating corners and pour joints with a suitable compound
  • Applying the waterproof layer across the floor, walls and pool rim
How we work

How we carry out pool waterproofing before tiling in AL THIYBIA

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

AL THIYBIA is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from AL THIYBIA comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in AL THIYBIA

How do I know if my pool concrete is ready for treatment?

Send us clear photos of the pool from different angles. We will tell you whether the concrete is dry enough and ready for waterproofing before tiling, and if a delay is needed we will advise you.

Does treating the concrete prevent damp in pool walls?

Treating the corners and joints properly before tiling greatly reduces the risk of water seeping and damp later. The result depends on how well the treatment is done and on subsequent maintenance of the joint sealant.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Do you cover AL THIYBIA?

Yes. We serve AL THIYBIA and nearby areas such as Al Fiwan, King Khālid Military City and Ash Shifa (near Hafar Al-Batin), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Nearby areas

We also offer it in neighbouring areas

We also offer pool waterproofing before tiling in Al Fiwan, King Khālid Military City and Ash Shifa (near Hafar Al-Batin), among the closest areas to AL THIYBIA.

Other services in the area

More services in AL THIYBIA

Mosaic-tiled seaside pool

In AL THIYBIA and need pool waterproofing before tiling?
Send us photos of the spot

Describe the problem and where it is in AL THIYBIA, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp