Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Jalmudah

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Jalmudah

Pool waterproofing before tiling in Jalmudah begins with photos of the pool and its condition sent via WhatsApp or call. Jalmudah is an area with compounds and villas; its pools range from new to old, each needing careful assessment before waterproofing starts.

Jalmudah is a residential area with compounds and villas of varying sizes, some from past years and some built recently. Old pools may show heavy cracking and leaks around corners and pipes, while newer ones may only need their waterproof layer updated. Intense summer heat and year-round dryness affect exposed concrete. Proper and thorough treatment of the floor, walls and corners before tiling ensures dampness does not appear under the ceramic shortly after. Photos show each pool's condition clearly so we can choose the right approach.

  • Jalmudah is a residential district in the Eastern Province near Makkah, Najd and Al Fanatir, comprising compounds and villas spread over wide land.
  • Pools in residential areas built many years ago usually need comprehensive concrete treatment before retiling.
What the service includes

What we do for you in Jalmudah

  • Closing feed and drain pipe inlets and light fitting openings
  • Cleaning the surface and removing casting residue and dust
  • Checking the layer is complete before tiling is allowed to begin
  • Treating corners and pour joints with a suitable compound
How we work

The steps of pool waterproofing before tiling in Jalmudah

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Start from Jalmudah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Jalmudah and around itIncluding Makkah, Najd and Al Fanatir, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Jalmudah

Can a very old pool in Jalmudah be treated without removing all the tiles?

If cracks are limited and tiles are sound, we may treat exposed areas and joints from outside. But if there is heavy leaking or severe damage, the tiles usually need lifting. Photos show the extent of damage and determine the right solution.

Does waterproofing a compound pool differ from waterproofing a standalone villa pool?

The waterproofing method is the same, but compound pools may be larger and access may be limited. Jalmudah has both types, and photos help us understand the size and conditions so we can plan treatment correctly.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Do you cover Jalmudah?

Yes. We serve Jalmudah and nearby areas such as Makkah, Najd and Al Fanatir, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Nearby areas

The same service in nearby areas

We also work near Jalmudah, in Makkah, Najd and Al Fanatir.

Other services in the area

More services in Jalmudah

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Jalmudah?
Call us now

Describe the problem and where it is in Jalmudah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp