
Pool waterproofing before tiling in Hajr
Pool waterproofing before tiling in Hajr starts with photos of the pool, its corners, pipes and openings sent by WhatsApp or call. Hajr ranges from villas to old and new apartment blocks, and each home may have a private pool with concrete in different condition and age.
Hajr has diverse residential buildings of different ages alongside compounds built years ago, some with private pools. Concrete in a modern pool is usually sound but may need pore and small crack filling, whilst older building pools often show deeper cracks at corners, joints and around pipe openings. Repeated water soaking and intense heat increase leak risk if these flaws are not treated before tiling. Photos show what treatment is needed.
- Hajr is a district in the Eastern Province, close to Tihamah, Qasr Al Khalij and Al Ferdous, with residential buildings of varied age.
- A pool in a home receives fresh water regularly, and any small crack in the concrete can allow continuous seepage behind the tiles.
The pool waterproofing before tiling work in Hajr
- Treating corners and pour joints with a suitable compound
- Cleaning the surface and removing casting residue and dust
- Applying the waterproof layer across the floor, walls and pool rim
- Closing feed and drain pipe inlets and light fitting openings
The steps of pool waterproofing before tiling in Hajr
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Your request from Hajr comes to usCall or WhatsApp on one number, and we answer you ourselves.
Start from Hajr with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool waterproofing before tiling in Hajr
What is the difference between treating a new and an old pool before tiling?
A new one needs pore and hairline crack filling; an old one typically has deeper, more cracks requiring more thorough treatment. Photos identify your case and what it needs.
Does concrete treatment before tiling stop all pool leaks?
Properly treating concrete, joints and pipes greatly reduces leakage, but tile quality and later maintenance also matter. Photos and inspection identify any pre-existing flaws.
How do I request pool waterproofing before tiling in Hajr?
Call us, or send clear photos of the spot and its location in Hajr on WhatsApp, and we will work out the next step with you.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
What materials are used to waterproof a pool shell before tiling?
Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.
How long must the waterproof layer cure before tiles go on?
It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.
The same service in nearby areas
If the site is outside Hajr, the same service is available in Tihamah, Qasr Al Khalij and Al Ferdous (near Dammam).
More services in Hajr

