Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Qasr Al Khalij

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Qasr Al Khalij

We offer pool waterproofing before tiling in Qasr Al Khalij, Al Khobar, starting with photos of the concrete pool shell, its corners and pipe inlets, sent by call or WhatsApp. Joints, corners and pipe openings are treated before tile adhesive and tiles go on, because whatever sits under the tiling has to be sound from the start.

Qasr Al Khalij is made up of villas and houses of mixed age, and the pool usually sits in a back or side garden. Older concrete pools often show cracking at the corners and around pipe openings, while newer ones may only need their joints treated before tiling. The photos give a clear picture of the shell's condition before any method is chosen.

  • Qasr Al Khalij is a residential district in Al Khobar in the Eastern Province, lying close to Tihamah, Al Muntazah and An Nahdah.
  • Joints and corners are the spots in a pool most prone to seepage, so they are treated before the tiling rather than after.
What the service includes

What we do for you in Qasr Al Khalij

  • Closing feed and drain pipe inlets and light fitting openings
  • Checking the layer is complete before tiling is allowed to begin
  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
How we work

The stages of the work in Qasr Al Khalij

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Your request from Qasr Al Khalij comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Qasr Al Khalij and around itIncluding Tihamah, Al Muntazah (near Dammam) and An Nahdah (near Dammam), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Qasr Al Khalij

Does a pool in Qasr Al Khalij need waterproofing before it is fully tiled?

It depends on the concrete shell as the photos show it. If the corners, joints and pipe inlets need treatment, it is best done before the adhesive and tiles go on.

What do you check in a villa pool before tiling?

We look at cracks, joints, pipe openings and the surface of the concrete, since villa pools are often in back gardens away from the street. We send our notes after reviewing the photos.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Is Qasr Al Khalij within your service area?

Yes, Qasr Al Khalij is one of the areas we work in, as are Tihamah, Al Muntazah (near Dammam) and An Nahdah (near Dammam). To start, call us or message us on WhatsApp.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Qasr Al Khalij, the same service is available in Tihamah, Al Muntazah (near Dammam) and An Nahdah (near Dammam).

Other services in the area

More services in Qasr Al Khalij

Mosaic-tiled seaside pool

In Qasr Al Khalij and need pool waterproofing before tiling?
Send us photos of the spot

Describe the problem and where it is in Qasr Al Khalij, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp