Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Dhahran

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Dhahran

Pool waterproofing before tiling in Dhahran starts with photos sent by WhatsApp or call, showing the concrete shell, corners and joints. The city has modern villas and apartment blocks with private and public pools, each varying in size and design before tiling.

Pools in Dhahran range from private ones in villas and apartment blocks to public ones in sports complexes. Before tiling, the concrete needs careful inspection because small cracks and weak joints between the pool walls and floor cause leaks later. Sun and coastal humidity stress exposed concrete. Problems are fixed before any lining and tiling, and the photos you send show what needs attention.

  • Dhahran is a city in the Eastern Province, next to Dammam and Al Khobar near King Fahd University of Petroleum and Minerals.
  • The joints between floor and walls in an open pool face both heat and water, so they must be sealed with care before tiling.
What the service includes

The main items of pool waterproofing before tiling in Dhahran

  • Inspecting the concrete and locating cracks and hairline cracks
  • Treating corners and pour joints with a suitable compound
  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
How we work

The stages of the work in Dhahran

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Start from Dhahran with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Dhahran comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Dhahran

How do you treat cracks in pool concrete before tiling?

We inspect cracks from the photos and identify them precisely. Hairline cracks are filled with flexible material, deeper cracks need cleaning first then special filling. All this happens before any lining and tiling to ensure no leaks.

Can a pool in Dhahran be sealed in humid coastal conditions?

Yes, but humidity requires careful work before sealing. We check the concrete and floor from photos and treat any damp or existing leaks before any sealing and tiling begins.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

How do I request pool waterproofing before tiling in Dhahran?

Call us, or send clear photos of the spot and its location in Dhahran on WhatsApp, and we will work out the next step with you.

Nearby areas

Pool waterproofing before tiling near Dhahran

We also offer pool waterproofing before tiling in Gharb Adh Dhahran, King Fahd University of Petroleum and Minerals and Ad Danah Al Janubiyah, among the closest areas to Dhahran.

Other services in the area

More services in Dhahran

Mosaic-tiled seaside pool

Tell us about your site in Dhahran
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp