Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in King Fahd University of Petroleum and Minerals

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in King Fahd University of Petroleum and Minerals

Pool waterproofing before tiling at King Fahd University of Petroleum and Minerals begins with photos of the shell, joints and cracks sent by call or WhatsApp. The site includes administrative, residential and sports buildings and swimming facilities, some newly built and others standing for years. Proper concrete treatment before tiling protects pools from leaks and dampness for long periods.

The campus has multiple-purpose pools: training pools, sports and fitness pools, and residential pools in student housing. The concrete shells range from new to middle-aged, each needing its own assessment. A newly poured shell may need minor treatment for shrinkage and joints, while an older one may carry accumulated cracks or weakness in corners and pipe entries. Stone and concrete buildings around the pools may affect foundation moisture. Photos show the actual pool condition so the right treatment can be chosen before tiling and use.

  • King Fahd University of Petroleum and Minerals is a district in the Eastern Province, close to Ad Dawhah Al Janubiyah and Ad Danah Al Janubiyah, with administrative and residential buildings.
  • Pools at large institutions face intensive use and rapid temperature swings, raising the risk of cracks.
What the service includes

What the service covers in King Fahd University of Petroleum and Minerals

  • Inspecting the concrete and locating cracks and hairline cracks
  • Treating corners and pour joints with a suitable compound
  • Checking the layer is complete before tiling is allowed to begin
  • Closing feed and drain pipe inlets and light fitting openings
How we work

From first contact to the finished job in King Fahd University of Petroleum and Minerals

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Your request from King Fahd University of Petroleum and Minerals comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from King Fahd University of Petroleum and Minerals with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in King Fahd University of Petroleum and Minerals

Can an older university pool be treated before being re-tiled?

Yes, if the base concrete is sound. We assess cracks and joints from photos and treat them, then tiling goes on. If the structure is badly damaged, photos will show it and we will tell you so.

Is pool treatment before tiling essential for training pools?

Yes, training pools are filled and drained repeatedly, so the concrete faces constant water pressure. Treatment before tiling prevents leakage and dampness underground that may weaken the structure.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

How do I request pool waterproofing before tiling in King Fahd University of Petroleum and Minerals?

Call us, or send clear photos of the spot and its location in King Fahd University of Petroleum and Minerals on WhatsApp, and we will work out the next step with you.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Nearby areas

Areas near King Fahd University of Petroleum and Minerals

If the site is outside King Fahd University of Petroleum and Minerals, the same service is available in Ad Dawhah Al Janubiyah, Ad Danah Al Janubiyah and Al Olaya.

Other services in the area

More services in King Fahd University of Petroleum and Minerals

Mosaic-tiled seaside pool

We start with you in King Fahd University of Petroleum and Minerals
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp