Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Bani Men

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Bani Men

Pool waterproofing before tiling in Bani Men begins with photos sent via WhatsApp or a call. Villas with gardens and private pools are scattered throughout the town, and they need proper concrete treatment first.

Private pools in the town face severe temperature swings that crack the concrete. The joints between floor and walls and areas around pipe inlets are most vulnerable to water seepage if not properly treated. Treating these areas before tile adhesive and tiles go on protects the pool from future damp and deterioration. Clear photos help us assess the level of cracking and concrete condition before choosing the treatment method.

  • Bani Men is a town in the Eastern Province, close to Ar Ruwaihah, Al Masif and Ad Duraydi, with scattered villas and houses.
  • Villas in small towns often have either older pools or newly built ones, and both need concrete treatment before tiling.
What the service includes

What the service covers in Bani Men

  • Applying the waterproof layer across the floor, walls and pool rim
  • Checking the layer is complete before tiling is allowed to begin
  • Closing feed and drain pipe inlets and light fitting openings
  • Treating corners and pour joints with a suitable compound
How we work

How we carry out pool waterproofing before tiling in Bani Men

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Start from Bani Men with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Bani Men comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Bani Men

Can an old pool be treated before re-tiling?

Yes, if the pool concrete is still sound. We remove the old tiles first, then treat the concrete, cracks and joints; the photos will show whether the structure can take this.

How long after treatment can the tiles be laid?

This depends on the treatment method used and the weather conditions. The photos and our assessment will tell you the time needed before tiling can begin.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Do you offer pool waterproofing before tiling in Bani Men?

Yes. Bani Men is within our service area in the Eastern Province, and we also work in Ar Ruwaihah, Al Masif (near Bani Men) and Ad Duraydi. Call us or send photos of the spot on WhatsApp.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Nearby areas

We also offer it in neighbouring areas

We also offer pool waterproofing before tiling in Ar Ruwaihah, Al Masif (near Bani Men) and Ad Duraydi, among the closest areas to Bani Men.

Other services in the area

More services in Bani Men

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Bani Men?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp