Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Masif (near Bani Men)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Masif (near Bani Men)

We treat pools in Al Masif before tiling after reviewing photos of the pool and its surroundings, which you send by call or WhatsApp. The district has scattered homes and villas where pools vary, and each one needs a lining suited to it.

Al Masif is made up of detached homes and villas with open grounds, and its pools differ in age and size. An older concrete pool usually shows cracks at the corners and around joints and inlets, while a newer one often needs full lining before tiling. Exposed surfaces take the sun's heat across the day, so the photos decide which treatment is needed.

  • Al Masif is a district in the Eastern Province with detached homes and villas, close to Ar Ruwaihah, Bani Men and Ad Duraydi.
  • Cracks tend to appear at water inlets, where stress concentrates on the concrete.
What the service includes

The main items of pool waterproofing before tiling in Al Masif (near Bani Men)

  • Treating corners and pour joints with a suitable compound
  • Inspecting the concrete and locating cracks and hairline cracks
  • Checking the layer is complete before tiling is allowed to begin
  • Closing feed and drain pipe inlets and light fitting openings
How we work

This is how we work in Al Masif (near Bani Men)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

We serve Al Masif (near Bani Men) and around itIncluding Ar Ruwaihah, Bani Men and Ad Duraydi, as part of our work across the Eastern Province.

Your request from Al Masif (near Bani Men) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Al Masif (near Bani Men)

Must old tiles be removed to waterproof a pool in Al Masif?

It depends on the tiles and the concrete beneath. If the tiles are flaking, removal is likely; if they are firmly bonded, surface preparation may be enough, and the photos will settle it.

How does work on a pool in Al Masif begin?

It starts with sending photos of the pool and its water inlets by call or WhatsApp, and telling us the pool's age and tile type so the right procedure can be set.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Do you cover Al Masif (near Bani Men)?

Yes. We serve Al Masif (near Bani Men) and nearby areas such as Ar Ruwaihah, Bani Men and Ad Duraydi, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Pool waterproofing before tiling near Al Masif (near Bani Men)

We also offer pool waterproofing before tiling in Ar Ruwaihah, Bani Men and Ad Duraydi, among the closest areas to Al Masif (near Bani Men).

Other services in the area

More services in Al Masif (near Bani Men)

Mosaic-tiled seaside pool

In Al Masif (near Bani Men) and need pool waterproofing before tiling?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp