Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in At Turbaibil

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in At Turbaibil

Pool waterproofing before tiling in At Turbaibil begins with photos of the pool and walls sent by WhatsApp or call. The district has farms, detached villas and small buildings, some with private pools, and concrete is affected by temperature swings and coastal humidity.

Pools in At Turbaibil, in villas or small buildings, suffer as concrete cracks from intense daytime heat and coastal night humidity. These swings create fine cracks and weaken the joints between walls and floor. Treating cracks, joints and pipe openings before tiling stops water seeping under the tiles and protects the pool from decay. Photos show which areas are damaged by water and heat before the waterproofing method is chosen.

  • At Turbaibil is a district in the Eastern Province, near Al Jubayl, Ash Shaharin and Al Qarah, with farms, villas and small buildings.
  • The temperature difference between day and night near the coast causes concrete in pools to expand and contract, which can open small cracks.
What the service includes

The main items of pool waterproofing before tiling in At Turbaibil

  • Checking the layer is complete before tiling is allowed to begin
  • Cleaning the surface and removing casting residue and dust
  • Closing feed and drain pipe inlets and light fitting openings
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

From first contact to the finished job in At Turbaibil

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Start from At Turbaibil with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

At Turbaibil is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in At Turbaibil

Does pool waterproofing before tiling stop leaks in villas in At Turbaibil?

Yes, if done properly before tiling. Treating cracks, joints and openings before tiles are laid stops water reaching underneath. If the pool already leaks, photos show where and how badly.

How does coastal humidity affect pools in At Turbaibil before tiling?

Humidity keeps concrete damp and speeds cracks getting worse. Treating and waterproofing the concrete before tiling reduces water and moisture absorption, protecting the structure.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Is At Turbaibil within your service area?

Yes, At Turbaibil is one of the areas we work in, as are Al Jubayl (near Al-Hofuf), Ash Shaharin and Al Qarah. To start, call us or message us on WhatsApp.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Nearby areas

The same service in nearby areas

We also work near At Turbaibil, in Al Jubayl (near Al-Hofuf), Ash Shaharin and Al Qarah.

Other services in the area

More services in At Turbaibil

Mosaic-tiled seaside pool

We start with you in At Turbaibil
with one call

Describe the problem and where it is in At Turbaibil, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp