Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Jubayl (near Al-Hofuf)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Jubayl (near Al-Hofuf)

Pool waterproofing before tiling in Al Jubayl starts with photos of the basin, its corners and the pipe inlets, sent by call or WhatsApp. The photos show the condition of the concrete before tile adhesive and any tile go on.

Al Jubayl has private homes and villas with gardens, and pools there are usually built in reinforced concrete with connected walls and floors. Problems tend to appear at the corners, at the wall-to-floor joints and around the skimmer and drain openings, which need particular attention before tiling. Condition varies from one pool to another with its age and construction, so the photos show what needs treating.

  • Al Jubayl is an industrial and residential city in the Eastern Province, lying close to At Turbaibil, Ash Shaharin and Al Qarah.
  • A tiled basin whose concrete was never treated can show dampness later, behind the tiles themselves.
What the service includes

The pool waterproofing before tiling work in Al Jubayl (near Al-Hofuf)

  • Applying the waterproof layer across the floor, walls and pool rim
  • Checking the layer is complete before tiling is allowed to begin
  • Inspecting the concrete and locating cracks and hairline cracks
  • Closing feed and drain pipe inlets and light fitting openings
How we work

This is how we work in Al Jubayl (near Al-Hofuf)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

We serve Al Jubayl (near Al-Hofuf) and around itIncluding At Turbaibil, Ash Shaharin and Al Qarah, as part of our work across the Eastern Province.

Al Jubayl (near Al-Hofuf) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Al Jubayl (near Al-Hofuf)

Should a pool in Al Jubayl be waterproofed before it is tiled?

Yes, waterproofing before tiling protects the concrete from water seeping behind the tiles. The photos tell us whether the concrete is ready for it.

What do you check at the pool corners in Al Jubayl?

We check for cracks and joints at the corners and around the skimmer and drain openings, the points most prone to leaks. These are treated before the lining goes on.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Do you cover Al Jubayl (near Al-Hofuf)?

Yes. We serve Al Jubayl (near Al-Hofuf) and nearby areas such as At Turbaibil, Ash Shaharin and Al Qarah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Jubayl (near Al-Hofuf), the same service is available in At Turbaibil, Ash Shaharin and Al Qarah.

Other services in the area

More services in Al Jubayl (near Al-Hofuf)

Mosaic-tiled seaside pool

In Al Jubayl (near Al-Hofuf) and need pool waterproofing before tiling?
Send us photos of the spot

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp