
Pool waterproofing before tiling in As Sufun
Pool waterproofing before tiling in As Sufun starts with an interior photo of the pool, its corners and pipes sent by call or WhatsApp. The district has villas and buildings of various sizes, each pool needing careful inspection before tiling.
As Sufun is a residential area with modern villas and apartment buildings, its pools private or shared and various shapes. Exposed pools face intense sun and humidity, so cracks and salt staining appear on the concrete and joints. Older pipes may be fixed to older walls and move slightly with temperature changes. All these defects are treated before tiling to avoid leaks beneath the tiles. Photos help us know which treatment suits your pool's condition.
- As Sufun is a residential district in the Eastern Province, near Al Amwaj, Al Loaloa and Ash Sheraa, with villas and apartment buildings.
- Hot and cold water pipes beside the pool create stress on the concrete at joints, raising the risk of leaks if not treated before tiling.
The scope of the work in As Sufun
- Inspecting the concrete and locating cracks and hairline cracks
- Closing feed and drain pipe inlets and light fitting openings
- Cleaning the surface and removing casting residue and dust
- Treating corners and pour joints with a suitable compound
The stages of the work in As Sufun
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Your request from As Sufun comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve As Sufun and around itIncluding Al Amwaj, Al Loaloa (near Dhahran) and Ash Sheraa, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool waterproofing before tiling in As Sufun
Must the area around pool pipes be treated before tiling?
Yes, definitely. Pipes move slightly with expansion and contraction, so areas around them crack easily. Treating these zones before tiling prevents later leaks.
Do you treat villa and apartment block pools the same way in As Sufun?
The basic method is the same, but details differ by pool size and location. Send photos of the pool from all sides, the pipes and joints, and we determine the right treatment with you.
What decides the cost of waterproofing a pool before tiling?
The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.
How do I request pool waterproofing before tiling in As Sufun?
Call us, or send clear photos of the spot and its location in As Sufun on WhatsApp, and we will work out the next step with you.
What materials are used to waterproof a pool shell before tiling?
Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
The same service in nearby areas
If the site is outside As Sufun, the same service is available in Al Amwaj, Al Loaloa (near Dhahran) and Ash Sheraa.
More services in As Sufun

