Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in An Nabiyah

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in An Nabiyah

Pool waterproofing before tiling in An Nabiyah begins with photos of the concrete, cracks and corners sent by call or WhatsApp. The town has villas with private pools, and concrete may show cracks from heat before the tiles are laid.

Pools in An Nabiyah are mainly in detached villas on plots of varying size. Fresh concrete faces intense sun heat and coastal humidity in some parts of town, causing cracks at corners and joints. These cracks and the openings where pipes pass through must be treated before tiling. Right treatment stops leaks from the start. Photos clearly show the concrete's state and any cracks.

  • An Nabiyah is a town in the Eastern Province, near Gharb An Nabiyah and Al Khalij, with detached villas.
  • Tiles stuck to concrete with cracks may lift or break, so cracks must be treated before tiling.
What the service includes

The main items of pool waterproofing before tiling in An Nabiyah

  • Checking the layer is complete before tiling is allowed to begin
  • Cleaning the surface and removing casting residue and dust
  • Applying the waterproof layer across the floor, walls and pool rim
  • Treating corners and pour joints with a suitable compound
How we work

The steps of pool waterproofing before tiling in An Nabiyah

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Pool waterproofing before tiling in An NabiyahWe choose the method and the materials once we know the condition of the spot.

Start from An Nabiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in An Nabiyah

How often do cracks appear in pool concrete in An Nabiyah after pouring?

Fine cracks almost always appear in the first days after pouring due to concrete shrinkage and intense heat. This is completely normal and does not mean the concrete is weak. These cracks must be treated before tiling. Send photos so we can see what has appeared.

Does coastal humidity near An Nabiyah affect pool waterproofing before tiling?

Yes, excess humidity can keep concrete damp, which affects tile and adhesive bond. We ensure the concrete is dry before treatment. Photos and location help us assess how much the site is affected by dampness.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

What should I send you from An Nabiyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in An Nabiyah, and we will work out the next step with you.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Nearby areas

Areas near An Nabiyah

We also work near An Nabiyah, in Gharb An Nabiyah, Al Khalij (near Sayhat) and An Naqa.

Other services in the area

More services in An Nabiyah

Mosaic-tiled seaside pool

Tell us about your site in An Nabiyah
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp