Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Khuzama (near Al Khafji)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Khuzama (near Al Khafji)

Pool waterproofing before tiling in Al Khuzama begins with photos of the basin and its edges, sent by call or WhatsApp. Al Khuzama sits close to Al Yasmin, Al Fayha and Al Aziziyah, and is largely residential, with houses and villas that have yards.

Al Khuzama has houses and villas of differing ages, and its pools are often built into the back or side yard. In a basin that has been in use for some time, fine cracks usually show at the joints and around the outlets, so treating those points becomes a key part of the work before adhesive and tiles go down. The photos show the condition of each basin individually.

  • Al Khuzama is a residential district in Al-Ahsa in the Eastern Province, close to Al Yasmin and Al Fayha.
  • Basin joints and water outlets are the spots that most often need extra lining before tiling.
What the service includes

What we do for you in Al Khuzama (near Al Khafji)

  • Inspecting the concrete and locating cracks and hairline cracks
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
  • Applying the waterproof layer across the floor, walls and pool rim
How we work

From first contact to the finished job in Al Khuzama (near Al Khafji)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Your request from Al Khuzama (near Al Khafji) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Pool waterproofing before tiling in Al Khuzama (near Al Khafji)We choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in Al Khuzama (near Al Khafji)

Is a pool in Al Khuzama waterproofed right before tiles go on?

Yes, the lining comes before adhesive and tiles in the sequence. Cracks and joints are treated first, the waterproofing goes on, and tiles follow once that layer has dried.

Does the method differ between older and newer homes in Al Khuzama?

The treatment depends on the state of the concrete: an older basin may need its cracks repaired first, while a newer one often only needs the lining applied. The photos decide which case applies before any method is chosen.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Is Al Khuzama (near Al Khafji) within your service area?

Yes, Al Khuzama (near Al Khafji) is one of the areas we work in, as are Al Yasmin (near Al Khafji), Al Fayha (near Al Khafji) and Al Aziziyah (near Al Khafji). To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Khuzama (near Al Khafji), in Al Yasmin (near Al Khafji), Al Fayha (near Al Khafji) and Al Aziziyah (near Al Khafji).

Other services in the area

More services in Al Khuzama (near Al Khafji)

Mosaic-tiled seaside pool

We start with you in Al Khuzama (near Al Khafji)
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp