Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Al Khuzama (near Al Khafji)

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Al Khuzama (near Al Khafji)

Cementitious pool waterproofing in Al Khuzama starts with photos of the pool and its surroundings, sent by call or WhatsApp. The district includes villas and detached houses, and pools are often built into the back gardens.

Al Khuzama is a residential district with many villas that have private pools, built at different times. An older pool often shows peeling coatings and cracks at tile corners, and water can reach the concrete without showing clearly on the surface. The pool interior is therefore checked before a flexible coating is chosen, and the photos show whether a full coating or local repair is needed.

  • Al Khuzama is a residential district in the Eastern Province, near Al Yasmin, Al Fayha and Al Aziziyah, dominated by villas.
  • An open pool withstands heat and humidity changes all year, so the coating must hold its bond.
What the service includes

What we do for you in Al Khuzama (near Al Khafji)

  • Applying the flexible cementitious layer over the whole shell
  • Closing return pipe openings and drain outlets before the coating goes on
  • Treating hairline cracks and the wall-to-floor junction
  • Checking the pool walls and floor and locating cracks and openings
How we work

The stages of the work in Al Khuzama (near Al Khafji)

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Start from Al Khuzama (near Al Khafji) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Khuzama (near Al Khafji) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Khuzama (near Al Khafji)

How do I know my pool in Al Khuzama needs coating?

From signs such as peeling paint, cracked tiles at the corners, and water levels falling for no clear reason. Send photos of the walls and floor and we will tell you what we see.

Do you treat indoor pools in villas in Al Khuzama?

Yes, we serve Al Khuzama. Send photos of the pool and where it sits, and tell us whether it is inside the building or in the garden so we can plan access with you.

What should I send you from Al Khuzama (near Al Khafji)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Khuzama (near Al Khafji), and we will work out the next step with you.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Does cementitious waterproofing work for both in-ground and above-ground pools?

Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

Nearby areas

Cementitious pool waterproofing near Al Khuzama (near Al Khafji)

We also work near Al Khuzama (near Al Khafji), in Al Yasmin (near Al Khafji), Al Fayha (near Al Khafji) and Al Aziziyah (near Al Khafji).

Other services in the area

More services in Al Khuzama (near Al Khafji)

Empty seaside pool during waterproofing

Your first step in Al Khuzama (near Al Khafji):
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp