Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Jazirah

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Jazirah

Pool waterproofing before tiling in Al Jazirah begins with photos of the pool basin, its corners and pipe inlets, sent by call or WhatsApp. The district mixes houses with smaller apartment buildings, and its pools range from private ones to shared ones, with the concrete shell treated before adhesive and tiles go on.

Al Jazirah has a mix of housing, so some pools are private features in a house yard while others belong to shared residential buildings. Basins vary in age, and leakage usually shows at the corners and joints where wall meets floor. Treatment locates those weak points before tiling, and the photos show whether a local repair is enough or a full lining is needed.

  • Al Jazirah is a district in the Eastern Province close to Al Wadiah, Al Khamisah and Kuwaikib, with a varied mix of houses and buildings.
  • A pool shared within a residential building needs tight joints because it takes more use than a private one.
What the service includes

The main items of pool waterproofing before tiling in Al Jazirah

  • Checking the layer is complete before tiling is allowed to begin
  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
  • Treating corners and pour joints with a suitable compound
How we work

This is how we work in Al Jazirah

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

We serve Al Jazirah and around itIncluding Al Wadiah, Al Khamisah and Kuwaikib, as part of our work across the Eastern Province.

Al Jazirah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Al Jazirah

Do you treat shared residential building pools in Al Jazirah?

Yes, we serve Al Jazirah. Send photos of the basin and its access, and tell us whether the pool is private or shared, so we can set the scope and access with you.

How can you tell if a pool in Al Jazirah needs a full lining?

The photos decide this. If leakage shows at several points across the basin, a full lining is usually the better choice; if it is confined to one corner or joint, a local repair may suffice.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Do you offer pool waterproofing before tiling in Al Jazirah?

Yes. Al Jazirah is within our service area in the Eastern Province, and we also work in Al Wadiah, Al Khamisah and Kuwaikib. Call us or send photos of the spot on WhatsApp.

Nearby areas

The same service in nearby areas

We also work near Al Jazirah, in Al Wadiah, Al Khamisah and Kuwaikib.

Other services in the area

More services in Al Jazirah

Mosaic-tiled seaside pool

In Al Jazirah and need pool waterproofing before tiling?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp