
Pool waterproofing in Al Jazirah
Pool waterproofing in Al Jazirah begins with photos of the pool shell and its surroundings, sent by call or on WhatsApp. The district has many newer villas on wider plots, where the pool is often part of the original build and the shell may still be untiled.
Al Jazirah has many newer villas on wider plots, and a pool there is often built with the house rather than added later. A new shell may still be bare when the owner asks about waterproofing, which makes its inside surface easy to reach. Wider plots can place the pool well away from the villa, so photos should include the edge of the deck and any nearby drainage. Whether the shell needs a lining or only a check will be shown by the photos.
- Al Jazirah is a district in the Eastern Province, close to Al Wadiah, Al Khamisah and Kuwaikib.
- A pool built with the house is usually easier to reach from the inside before tiling.
The pool waterproofing work in Al Jazirah
- Closing the waterproofing around the skimmer, drains and light fittings
- Working before or after tiling depending on the condition of the pool
- Checking the shell walls, floor and corners
- Treating cracks, joints and fitting openings
How we carry out pool waterproofing in Al Jazirah
Send photos of the pool
On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.
Inspect the shell and locate the points
The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.
Prepare the surface and treat the cracks
The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.
Apply the layer and let it cure
The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.
Why Abraj Al Azl?
Water finds no way through the shellA continuous layer closes the cracks, the openings and the joints together, so the water has no path through the shell after treatment.
Your request from Al Jazirah comes to usCall or WhatsApp on one number, and we answer you ourselves.
Al Jazirah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
Before you book pool waterproofing in Al Jazirah
Is it better to waterproof a pool during construction?
Usually yes, since the inside of the bare shell is open before any tile covers it. Photos of the shell will show whether it is ready, and we can agree the next step with you from there.
Do you work on villas on wider plots in Al Jazirah?
Yes, we serve Al Jazirah. Send photos of the pool, the deck and the nearby drainage, and tell us whether the villa is finished or still under construction, so we can plan the work with you.
Can a tiled pool be waterproofed without lifting the tiles?
In some cases yes, if the leak is limited to the joints or around a specific fitting. But if the concrete shell beneath the tiles is the source, lifting the tiles in certain areas may be needed. Photos and inspection decide that; there is no single answer that fits every pool.
Does the pool have to be emptied before the work starts?
In most cases yes, because the waterproofing needs a dry clean surface that can be inspected and prepared. Some crack injection materials work under water, but the final decision depends on the case and where the leak is. Send photos and we will tell you what needs to be prepared before the work starts.
Does the waterproofing method change with the shape and depth of the pool?
Yes. Pools with many corners or irregular shapes need more care at the bends because stresses concentrate there. The depth also affects the pressure the waterproof layer must carry. A liquid membrane forms easily at these points, while a cementitious coating needs careful preparation at the corners. Photos help us decide the right treatment for each shape.
Is Al Jazirah within your service area?
Yes, Al Jazirah is one of the areas we work in, as are Al Wadiah, Al Khamisah and Kuwaikib. To start, call us or message us on WhatsApp.
The same service in nearby areas
Nearby areas we also cover: Al Wadiah, Al Khamisah and Kuwaikib.
More services in Al Jazirah


