Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Iskan Al Janubi

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Iskan Al Janubi

In Al Iskan Al Janubi, Al Khobar, pool waterproofing before tiling starts with photos of the pool shell, its corners and pipe inlets sent by call or WhatsApp. Joints, corners and pipe openings are treated before the adhesive and tiles go on, because the base must be sound before it is covered.

Al Iskan Al Janubi has houses and small residential compounds of differing ages, and the pool there usually sits in a courtyard or part of a garden. Older concrete pools tend to show cracks at the edges and around pipes, while newer ones may only need their joints treated before tiling. The photos show the state of the shell so the right method can be picked.

  • Al Iskan Al Janubi is a residential district in Al Khobar in the Eastern Province, close to Al Urubah, Al Hazm and Al Iskan Al Shimali.
  • Edges and concrete outlets are the points most exposed to cracking when the structure moves, so they warrant checking first.
What the service includes

What we do for you in Al Iskan Al Janubi

  • Treating corners and pour joints with a suitable compound
  • Checking the layer is complete before tiling is allowed to begin
  • Cleaning the surface and removing casting residue and dust
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

This is how we work in Al Iskan Al Janubi

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Your request from Al Iskan Al Janubi comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Iskan Al Janubi with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing before tiling in Al Iskan Al Janubi

Can a pool in Al Iskan Al Janubi be waterproofed without removing old tiles?

It depends on the old tiles and the shell beneath them, which the photos help establish. If the old tiling hides cracks or seepage, removing it may be necessary to treat the base.

What do you deal with first in a pool in Al Iskan Al Janubi?

We start with cracks, open joints and pipe inlets, since problems usually appear there. Then we treat the rest of the shell's surface before the adhesive and tiles go on.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

How do I request pool waterproofing before tiling in Al Iskan Al Janubi?

Call us, or send clear photos of the spot and its location in Al Iskan Al Janubi on WhatsApp, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Urubah (near Dhahran), Al Hazm (near Dhahran) and Al Iskan Al Shimali.

Other services in the area

More services in Al Iskan Al Janubi

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Al Iskan Al Janubi?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp