Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Iskan Al Shimali

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Iskan Al Shimali

Pool waterproofing before tiling in Al Iskan Al Shimali starts with photos of the shell, its corners and joints sent by call or WhatsApp. We treat the concrete surface and pipes to ensure complete protection before adhesive and tiles.

Al Iskan Al Shimali features relatively modern residential compounds, many with shared or individual unit pools. Concrete shells in these compounds face temperature and humidity changes, causing fine cracks at joints and corners. Damp around pipe entries and in grooves can erode concrete if untreated before tiling. The photos reveal the concrete's actual condition and show what treatments are needed.

  • Al Iskan Al Shimali is a district in the Eastern Province, close to Al Fursan, Ash Shrouk and Al Urubah.
  • Joints between concrete slabs and the floor are the pool's weakest points for water leakage.
What the service includes

The main items of pool waterproofing before tiling in Al Iskan Al Shimali

  • Cleaning the surface and removing casting residue and dust
  • Closing feed and drain pipe inlets and light fitting openings
  • Applying the waterproof layer across the floor, walls and pool rim
  • Treating corners and pour joints with a suitable compound
How we work

From first contact to the finished job in Al Iskan Al Shimali

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

We serve Al Iskan Al Shimali and around itIncluding Al Fursan, Ash Shrouk (near An Nabiyah) and Al Urubah (near Dhahran), as part of our work across the Eastern Province.

Your request from Al Iskan Al Shimali comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing before tiling in Al Iskan Al Shimali

Does slight damp on the pool walls mean waterproofing before tiling is necessary?

Yes, damp indicates fine seepage or deep moisture. If untreated before tiling, it will worsen and water will pool beneath. Send photos of the damp areas and we can determine the solution with you.

Do you treat fine and deep cracks the same way before tiling?

No, the method differs. Fine cracks need filling and sealing, while deep ones may need injection or deeper packing. Photos and inspection determine the right method for each location in the shell.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

How do I request pool waterproofing before tiling in Al Iskan Al Shimali?

Call us, or send clear photos of the spot and its location in Al Iskan Al Shimali on WhatsApp, and we will work out the next step with you.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

Nearby areas

The same service in nearby areas

We also work near Al Iskan Al Shimali, in Al Fursan, Ash Shrouk (near An Nabiyah) and Al Urubah (near Dhahran).

Other services in the area

More services in Al Iskan Al Shimali

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Al Iskan Al Shimali?
Call us now

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp