Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Iskan (near Mallahah)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Iskan (near Mallahah)

Pool waterproofing before tiling in Al Iskan begins with WhatsApp photos of the pool, concrete condition and corners. The district has residential buildings and villas with private and shared pools, where concrete often bears marks of dryness, heat and moisture.

Al Iskan's pools vary: some are older with walls and floors showing slow cracks, others newer needing protection renewal before fresh tiling. Corners and joints between walls and floor are most prone to leaks, especially in shared pools under heavier water pressure. Careful treatment of these points before tiling ensures the tiles themselves last.

  • Al Iskan is a district in the Eastern Province near Al Badrani, Ar Rayah and Al Jish, with residential buildings and villas.
  • Shared pools in apartment blocks carry higher water pressure, so treating joints before tiling is critical to prevent leaks.
What the service includes

The pool waterproofing before tiling work in Al Iskan (near Mallahah)

  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
  • Checking the layer is complete before tiling is allowed to begin
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

The stages of the work in Al Iskan (near Mallahah)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Pool waterproofing before tiling in Al Iskan (near Mallahah)We choose the method and the materials once we know the condition of the spot.

Your request from Al Iskan (near Mallahah) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Al Iskan (near Mallahah)

How long does the treatment take to dry before tiling begins?

Drying depends on the materials used and weather. We send you the timeline after reviewing photos and choosing the method, and we wait until everything is completely dry before the contractor starts tiling.

Do you treat shared pools in Al Iskan apartment buildings?

Yes, we serve Al Iskan. Send photos of the pool interior, corners and joints, and tell us whether it is shared or private so we plan the treatment correctly.

Is Al Iskan (near Mallahah) within your service area?

Yes, Al Iskan (near Mallahah) is one of the areas we work in, as are Al Badrani, Ar Rayah and Al Jish (near Ar Rayah). To start, call us or message us on WhatsApp.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Iskan (near Mallahah), in Al Badrani, Ar Rayah and Al Jish (near Ar Rayah).

Other services in the area

More services in Al Iskan (near Mallahah)

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Al Iskan (near Mallahah)?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp