Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Badrani

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Badrani

In Al Badrani, pool waterproofing before tiling begins with photos of the basin, its edges and its pipes, sent by call or WhatsApp. We treat the concrete shell first, then confirm it is ready for tiling.

Al Badrani is a hamlet of courtyard houses and some newer villas, where a pool may sit close to an exterior wall. Cracks in these basins usually appear at the corner where two walls meet, and at the points where drainage and supply enter. Waterproofing focuses on those spots before any tile layer, then the surface is checked to stay dry and firm.

  • Al Badrani is a hamlet in the Eastern Province, near Al Iskan, Al Badiah and Ar Rayah, with courtyard houses and newer villas.
  • The corner where two basin walls meet is among the spots most prone to cracking in a pool.
What the service includes

What the service covers in Al Badrani

  • Cleaning the surface and removing casting residue and dust
  • Closing feed and drain pipe inlets and light fitting openings
  • Inspecting the concrete and locating cracks and hairline cracks
  • Treating corners and pour joints with a suitable compound
How we work

The stages of the work in Al Badrani

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Pool waterproofing before tiling in Al BadraniWe choose the method and the materials once we know the condition of the spot.

Your request from Al Badrani comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Al Badrani

Can a pool basin set against a house wall in Al Badrani be waterproofed?

Usually yes, provided the shell is sound at the junction. The photos let us judge how much crack treatment is needed at the wall before tiling.

Where do problems show first in a pool before tiling?

At interior corners and at drain and supply openings, which is why the inspection photos focus on those points.

Do you offer pool waterproofing before tiling in Al Badrani?

Yes. Al Badrani is within our service area in the Eastern Province, and we also work in Al Iskan (near Mallahah), Al Badiah and Ar Rayah. Call us or send photos of the spot on WhatsApp.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Badrani, the same service is available in Al Iskan (near Mallahah), Al Badiah and Ar Rayah.

Other services in the area

More services in Al Badrani

Mosaic-tiled seaside pool

In Al Badrani and need pool waterproofing before tiling?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp