Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Husayy

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Husayy

Pool waterproofing before tiling in Al Husayy starts with photos of the pool shell, its corners and joints, sent by call or WhatsApp. Al Husayy is a small hamlet of scattered homes, where a pool is often in a back yard or within a farm.

Homes in small hamlets are scattered and mostly standalone on wide plots, and a pool there is usually a concrete build in the yard. Before tiling, corners, joints and pipe inlets must be treated, since any fault beneath the tiles shows later as a leak. The photos decide whether the shell is sound or needs its cracks treated before any lining.

  • Al Husayy is a hamlet in Al-Ahsa within the Eastern Province, lying close to Utayyiq and Ghanwa.
  • A pool tiled without treating its corners often leaks first at a corner.
What the service includes

The scope of the work in Al Husayy

  • Treating corners and pour joints with a suitable compound
  • Applying the waterproof layer across the floor, walls and pool rim
  • Checking the layer is complete before tiling is allowed to begin
  • Closing feed and drain pipe inlets and light fitting openings
How we work

This is how we work in Al Husayy

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Your request from Al Husayy comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Husayy is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Al Husayy

Can a back-yard pool in Al Husayy be waterproofed without removing the tiles?

It depends on the tiles and the layer beneath, which the photos reveal. If tiles are already laid we will tell you what can be treated without removal and when removal becomes necessary.

What matters most when waterproofing a pool in Al Husayy before tiling?

The most important points are the corners, joints and pipe inlets, as they are where most leaks start. All are treated before the adhesive goes on, and the photos show which need the most attention.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Do you offer pool waterproofing before tiling in Al Husayy?

Yes. Al Husayy is within our service area in the Eastern Province, and we also work in Utayyiq, Ghanwa and Nita. Call us or send photos of the spot on WhatsApp.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

The same service in nearby areas

We also work near Al Husayy, in Utayyiq, Ghanwa and Nita.

Other services in the area

More services in Al Husayy

Mosaic-tiled seaside pool

Your first step in Al Husayy:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp