
Cementitious pool waterproofing in Al Husayy
Pool waterproofing in Al Husayy begins with photos of the walls, floor and tile line, sent by call or on WhatsApp. We serve this small settlement in the Eastern Province, close to Utayyiq, Ghanwa and Nita, where homes are spread apart and pools tend to be modest and private. The photos show whether a cement coating is a suitable option for your basin.
Al Husayy is a small hamlet of scattered houses, where a private pool is usually a modest basin set in a family yard or on a plot close to the home. Pools like these sit in shade for part of the day and in full sun for the rest, so the coating heats unevenly. Older joints between the basin and its edge are often the first place water finds its way in. The photos let us judge the joints and walls before any method is chosen.
- Al Husayy is a small hamlet in the Eastern Province, lying close to Utayyiq, Ghanwa and Nita.
- Small pools heat unevenly between shade and sun, so the coating may crack along that dividing line.
What the service covers in Al Husayy
- Checking the pool walls and floor and locating cracks and openings
- Closing return pipe openings and drain outlets before the coating goes on
- Applying the flexible cementitious layer over the whole shell
- Treating hairline cracks and the wall-to-floor junction
The stages of the work in Al Husayy
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
Al Husayy is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We serve Al Husayy and around itIncluding Utayyiq, Ghanwa and Nita, as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Husayy
Does a pool in a small yard need the same preparation?
The steps are the same in principle: cleaning, repair, then coating. How much work is needed depends on the basin, and a small pool with sound walls may need less preparation than an older one, which the photos will decide.
Do you coat pools in small settlements like Al Husayy?
Yes, we serve Al Husayy. Send photos of the pool, its edge and the route to the yard, and let us know whether the water stays full all year or is drained for part of it.
Do you cover Al Husayy?
Yes. We serve Al Husayy and nearby areas such as Utayyiq, Ghanwa and Nita, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Why is the cementitious coating kept moist after it is applied?
Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
More services in Al Husayy

