
Pool waterproofing before tiling in Al Hunayy
Pool waterproofing before tiling in Al Hunayy starts with photos of the pool shell, its edges and the pipe inlets, sent by call or WhatsApp. The shell is treated before tile adhesive and tiles go on, because the base is where the work matters most.
Al Hunayy is a village of houses and villas with generous yards, where a pool often sits in the back garden. Pool shells in such homes tend to show movement at the corners and around pipe inlets first. The treatment addresses those points before the surface is checked to confirm that tiles will bond to a dry, clean base.
- Al Hunayy is a village in the Eastern Province, close to Al Qusaybi, Udhailiyah and Al Uthmaniyah, with houses and villas that have open yards.
- Corners and pipe inlets in a pool shell are where movement usually appears first.
What the service covers in Al Hunayy
- Checking the layer is complete before tiling is allowed to begin
- Cleaning the surface and removing casting residue and dust
- Inspecting the concrete and locating cracks and hairline cracks
- Closing feed and drain pipe inlets and light fitting openings
The stages of the work in Al Hunayy
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.
Your request from Al Hunayy comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Al Hunayy and around itIncluding Al Qusaybi, Udhailiyah and Al Uthmaniyah, as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Common questions on pool waterproofing before tiling in Al Hunayy
Should a pool in Al Hunayy be waterproofed before the tiles go on?
Yes, waterproofing is applied to the concrete shell before tile adhesive. The photos show whether the pool is ready or needs its cracks treated first.
What is checked in a pool in a village like Al Hunayy?
The corners, joints, pipe inlets and floor drainage are checked, since private pool shells in villas are most exposed at these points.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
Do you offer pool waterproofing before tiling in Al Hunayy?
Yes. Al Hunayy is within our service area in the Eastern Province, and we also work in Al Qusaybi, Udhailiyah and Al Uthmaniyah. Call us or send photos of the spot on WhatsApp.
Why is the pool shell waterproofed before tiling and not after?
Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.
How long must the waterproof layer cure before tiles go on?
It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.
Areas near Al Hunayy
If the site is outside Al Hunayy, the same service is available in Al Qusaybi, Udhailiyah and Al Uthmaniyah.
More services in Al Hunayy

