
Pool waterproofing in Al Hunayy
Pool waterproofing in Al Hunayy covers the inside of concrete pool shells, applied before tiling or after the existing finish is lifted for repair. We serve Al Hunayy, a village close to Al Qusaybi in the Eastern Province. Begin by sending photos of the pool and its walls by call or WhatsApp.
Villages like Al Hunayy are made up of houses with their own gardens, farm plots and larger private homes, where a pool is often built in the yard rather than inside a shared block. Pools in this setting face direct sun and wide temperature swings between day and night, which can stress the surface of the shell. Leaks usually appear at the wall joints, around the drain and inlet fittings, and where the floor meets the wall. Photos of the shell and of the tiled or bare surface show whether the lining should go on before tiling or whether the existing finish must come off first.
- Al Hunayy is a village in the Eastern Province, lying close to Al Qusaybi and Udhailiyah.
- Pool shells are often exposed to sun, so the lining and the tile bed must tolerate heat as well as water.
What the service covers in Al Hunayy
- Closing the waterproofing around the skimmer, drains and light fittings
- Leaving the layer to cure before refilling or tiling
- Applying the layer that suits the condition of the surface
- Treating cracks, joints and fitting openings
This is how we work in Al Hunayy
Send photos of the pool
On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.
Inspect the shell and locate the points
The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.
Prepare the surface and treat the cracks
The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.
Apply the layer and let it cure
The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.
Why Abraj Al Azl?
Water finds no way through the shellA continuous layer closes the cracks, the openings and the joints together, so the water has no path through the shell after treatment.
We serve Al Hunayy and around itIncluding Al Qusaybi, Udhailiyah and Al Uthmaniyah, as part of our work across the Eastern Province.
Your request from Al Hunayy comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Questions about pool waterproofing in Al Hunayy
Can a pool in Al Hunayy be waterproofed before tiling?
Yes, that is the usual point for the lining, once the concrete shell is sound and dry enough. Photos of the bare surface will show whether any cracks need repair first.
Do you work on private pools in Al Hunayy villages?
Yes, we serve Al Hunayy. Send photos of the pool and its surroundings, and tell us whether it is already tiled, so we can suggest the right approach with you.
Do you cover Al Hunayy?
Yes. We serve Al Hunayy and nearby areas such as Al Qusaybi, Udhailiyah and Al Uthmaniyah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Does the waterproofing method change with the shape and depth of the pool?
Yes. Pools with many corners or irregular shapes need more care at the bends because stresses concentrate there. The depth also affects the pressure the waterproof layer must carry. A liquid membrane forms easily at these points, while a cementitious coating needs careful preparation at the corners. Photos help us decide the right treatment for each shape.
How do I know the pool is losing water through a leak and not evaporation?
Close the pool and stop the filtration system for a period and mark the water level. If the level falls more than the heat and the wind can explain, there is a leak. You can also check whether the soil around the pool stays wet. Send us photos and a description of what you notice on WhatsApp and we will help you read it.
What materials are used for pool internal waterproofing?
Common materials include flexible cementitious coating that holds up under permanent moisture, liquid membrane that forms in place and covers corners and fittings easily, and crack injection materials. The choice depends on the condition of the shell and whether the work is before or after tiling.
Pool waterproofing near Al Hunayy
We also work near Al Hunayy, in Al Qusaybi, Udhailiyah and Al Uthmaniyah.
More services in Al Hunayy

