Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Ghadir

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Ghadir

Pool waterproofing before tiling in Al Ghadir begins with WhatsApp photos of the concrete, floor, walls and corners. The district has villas and buildings with diverse private pools, where concrete condition varies between old and new and determines the treatment method.

Al Ghadir's pools range from older villas with simple pools to newer villas with complex designs. Old concrete may carry persistent dampness around walls or cracks at joints, and new concrete may need protective treatment before tiling. Dry heat affects concrete and moisture increases leak risk. Careful treatment of the floor, corners and pipes before tiling prevents later problems.

  • Al Ghadir is a district in the Eastern Province near Al Muntazah, An Noor and Al Naseem, with villas and residential buildings.
  • Old tiles on a pool floor may hide cracks in the concrete below, so removing them and checking the surface before new waterproofing is essential.
What the service includes

The main items of pool waterproofing before tiling in Al Ghadir

  • Closing feed and drain pipe inlets and light fitting openings
  • Cleaning the surface and removing casting residue and dust
  • Inspecting the concrete and locating cracks and hairline cracks
  • Checking the layer is complete before tiling is allowed to begin
How we work

The steps of pool waterproofing before tiling in Al Ghadir

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Start from Al Ghadir with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Al Ghadir is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Ghadir

Can old tiles be removed and waterproofing redone at the same time?

Yes, old tiles are removed first and then we check the concrete below. If it is sound we treat any cracks or weak joints; if damaged, the photos show it and we tell you what is needed.

Do you treat pools with complex or unusual shapes in Al Ghadir?

Yes, we serve Al Ghadir. Complex shapes need detailed photos from different angles so we understand the joints and difficult corners. Send the photos and we will identify the best method for your pool's design.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

How do I request pool waterproofing before tiling in Al Ghadir?

Call us, or send clear photos of the spot and its location in Al Ghadir on WhatsApp, and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Ghadir, the same service is available in Al Muntazah (near Sayhat), An Noor (near Sayhat) and Al Naseem.

Other services in the area

More services in Al Ghadir

Mosaic-tiled seaside pool

Tell us about your site in Al Ghadir
and we will plan the next step with you

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp