Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Al Ghadir

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Al Ghadir

Cementitious pool waterproofing in Al Ghadir begins with photos of the pool and surroundings sent by call or WhatsApp. The district houses villas and apartment blocks with private and communal pools facing moisture and salt pressure.

Al Ghadir pools vary in size and age, from small villa basins to shared community pools. Concrete faces constant pressure from water, solar heat and coastal humidity, causing wall and floor cracks and joint failure. Flexible cementitious coating seals these cracks and bonds walls to floor and tile together; photos determine what extra treatments may be needed.

  • Al Ghadir is a residential district in the Eastern Province, near Al Muntazah, An Noor and Al Naseem, with villas and apartment buildings.
  • Pools in coastal or near-coastal areas are affected by salt in humidity, accelerating concrete degradation and tile weakening.
What the service includes

What we do for you in Al Ghadir

  • Treating hairline cracks and the wall-to-floor junction
  • Closing return pipe openings and drain outlets before the coating goes on
  • Wet curing after application so the coating sets correctly
  • Checking the pool walls and floor and locating cracks and openings
How we work

This is how we work in Al Ghadir

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

Your request from Al Ghadir comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Ghadir with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Ghadir

How often does a pool in Al Ghadir need wall re-sealing?

It depends on the concrete's base condition and weather exposure. Initial photos help us estimate when new cracks may appear, and periodic checks determine when re-coating is needed.

Does salt in the air affect how long the coating lasts?

Yes, salt and humidity together accelerate concrete degradation and reduce coating effectiveness over time. Cementitious coating provides strong protection, but periodic checks ensure early detection of damage.

How do I request cementitious pool waterproofing in Al Ghadir?

Call us, or send clear photos of the spot and its location in Al Ghadir on WhatsApp, and we will work out the next step with you.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

How do I know if the concrete is ready for the cementitious coating?

The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.

How does cementitious waterproofing differ from other pool coatings?

Cementitious waterproofing is cement-based with flexible additives; it bonds to concrete and accepts tile adhesive directly on top. Other types such as polyurethane or epoxy have different properties and suit different situations. The choice depends on the concrete condition and whether tiles are going on, which the photos help us work out.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Ghadir, the same service is available in Al Muntazah (near Sayhat), An Noor (near Sayhat) and Al Naseem.

Other services in the area

More services in Al Ghadir

Empty seaside pool during waterproofing

We start with you in Al Ghadir
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp