Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Bustan (near Ghizlan)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Bustan (near Ghizlan)

Pool waterproofing before tiling in Al Bustan starts with photos of the basin and its pipework, sent by call or WhatsApp. The district has houses, villas and private pools, and each basin needs treatment suited to its size and shape.

Basins in the district vary, from small garden pools to larger ones at villas, and their construction and age can differ. Drain and supply pipes need care where they meet the wall before the lining goes on. Photos show the condition of the concrete and where the pipes run, and the approach is chosen from that.

  • Al Bustan is a residential district in the Eastern Province, close to Al Tawyah, Al Merqab and Al Jubayl.
  • Pipes that pass through a basin wall need separate treatment, as their entry points are often the weakest spots.
What the service includes

The main items of pool waterproofing before tiling in Al Bustan (near Ghizlan)

  • Applying the waterproof layer across the floor, walls and pool rim
  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
  • Closing feed and drain pipe inlets and light fitting openings
How we work

The steps of pool waterproofing before tiling in Al Bustan (near Ghizlan)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

We serve Al Bustan (near Ghizlan) and around itIncluding Al Tawyah, Al Merqab and Al Jubayl (near Ghizlan), as part of our work across the Eastern Province.

Pool waterproofing before tiling in Al Bustan (near Ghizlan)We choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Bustan (near Ghizlan)

Do you waterproof pools in home gardens in Al Bustan?

Yes, we serve Al Bustan. Send photos of the pool and where it sits in the garden, so we can confirm whether the basin needs lining before tiles are fitted.

Why does treating pipes matter before tiling?

Pipe entry points are often where water first leaks, so they are treated before adhesive and tiles go on to reduce the chance of seepage.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

What should I send you from Al Bustan (near Ghizlan)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Bustan (near Ghizlan), and we will work out the next step with you.

Nearby areas

The same service in nearby areas

If the site is outside Al Bustan (near Ghizlan), the same service is available in Al Tawyah, Al Merqab and Al Jubayl (near Ghizlan).

Other services in the area

More services in Al Bustan (near Ghizlan)

Mosaic-tiled seaside pool

We start with you in Al Bustan (near Ghizlan)
with one call

Describe the problem and where it is in Al Bustan (near Ghizlan), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp