Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Bahar (near Al Khobar)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Bahar (near Al Khobar)

Pool waterproofing before tiling in Al Bahar begins with photos sent via WhatsApp or call. Villas and residential compounds are widespread in this district, many with private pools requiring concrete and joint treatment before tiling.

Pools in Al Bahar are typically private, attached to villas and compounds, either sunken or slightly raised. Freshly poured concrete may retain internal moisture, and seams between surfaces, walls and corners are prone to cracking from heat and water pressure. Treating these areas before tiling prevents later leaks, and photos reveal any concrete weakness needing prior repair.

  • Al Bahar is a district in the Eastern Province, near Ar Rakah Al Janubiyah, As Sadafah and Ar Rawabi.
  • Private pools in residential areas often leak at corners if not waterproofed before tiling.
What the service includes

The main items of pool waterproofing before tiling in Al Bahar (near Al Khobar)

  • Closing feed and drain pipe inlets and light fitting openings
  • Cleaning the surface and removing casting residue and dust
  • Applying the waterproof layer across the floor, walls and pool rim
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

The steps of pool waterproofing before tiling in Al Bahar (near Al Khobar)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Start from Al Bahar (near Al Khobar) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Bahar (near Al Khobar) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing before tiling in Al Bahar (near Al Khobar)

Can an old pool in Al Bahar be waterproofed without removing existing tiles?

Removing tiles first is better as it allows direct treatment of concrete, joints and access to all cracks. If removal is not possible, limited options exist but are less effective. Send photos of the tiles and concrete so we can decide together.

How long must waterproofing cure before tiling can start?

That depends on the materials and climate conditions. Send us photos and details so we can tell you the timeline suited to your case.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Do you cover Al Bahar (near Al Khobar)?

Yes. We serve Al Bahar (near Al Khobar) and nearby areas such as Ar Rakah Al Janubiyah, As Sadafah (near Al Khobar) and Ar Rawabi (near Al Khobar), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

If the site is outside Al Bahar (near Al Khobar), the same service is available in Ar Rakah Al Janubiyah, As Sadafah (near Al Khobar) and Ar Rawabi (near Al Khobar).

Other services in the area

More services in Al Bahar (near Al Khobar)

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Al Bahar (near Al Khobar)?
Call us now

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp