Abraj Al AzlContracting
Call العربية
Worker brushing cold bitumen onto a concrete surface with a long brush

Cold bitumen waterproofing in Al Bahar (near Al Khobar)

Waterproofing without a flame

Cold-applied bitumen coating by brush or roller, for foundations, bathrooms, planters and roofs

+966 54 311 2066
The service in your area

Cold bitumen waterproofing in Al Bahar (near Al Khobar)

Cold bitumen waterproofing in Al Bahar starts with photos sent by call or WhatsApp. The district lies near the coast and holds villas and apartments, whose foundations, unit bathrooms and roofs need protection from salt spray and water.

Al Bahar is a coastal district mixing residential villas and mid-rise apartment blocks of varying age. Proximity to the sea means salt and humidity penetrate foundations and lower walls more forcefully than inland. Cold bitumen is applied by brush or roller to foundations, yards, bathrooms and roofs, providing a waterproof layer without heat. Damp, salt-laden air stresses the coating, so the surface must be clean and dry before application, and photos confirm this.

  • Al Bahar is a coastal district in the Eastern Province near Ar Rakah Al Janubiyah and As Sadafah, consisting of villas and apartment blocks.
  • Foundations and walls near salt absorb moisture faster, and cold bitumen needs a completely dry surface to achieve best adhesion.
What the service includes

What we do for you in Al Bahar (near Al Khobar)

  • Treating cracks and joints before application
  • Adding the protective layer on sun-exposed surfaces once dry
  • Applying the waterproof coating by brush or roller over the whole surface
  • Cleaning the surface and removing loose material and grease
How we work

This is how we work in Al Bahar (near Al Khobar)

1

Send photos of the area

On WhatsApp: photos of the surface to be waterproofed, any cracks, and the surrounding area, so we can decide the right treatment and material.

2

Clean and prepare the surface

The surface is cleaned of dust, oils and loose material. Cracks and joints are treated, and the surface is left to dry fully before application. A damp surface prevents the coating from bonding.

3

Apply the waterproof coating

The material is brushed or rolled over the whole surface, turned up at walls and the parapet, and closed tightly around drain openings, AC bases and any penetration. The layers applied depend on the surface condition and its location.

4

Cure and protective layer

The coating is left to dry and harden. On surfaces exposed to sun, a protective layer is added over it, because cold bitumen left bare is degraded by intense heat and ultraviolet light over time.

What sets us apart

Why Abraj Al Azl?

Penetrates pores and hairline cracksThe liquid body lets the material enter pores and hairline cracks in the concrete before it sets, forming a seal both inside and at the surface.

Al Bahar (near Al Khobar) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Bahar (near Al Khobar) and around itIncluding Ar Rakah Al Janubiyah, As Sadafah (near Al Khobar) and Ar Rawabi (near Al Khobar), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cold bitumen waterproofing in Al Bahar (near Al Khobar)

Does cold bitumen resist salt in Al Bahar?

Bitumen resists salt and moisture, but the surface must first be cleared of salt deposits. Fresh water cleans the surface before application. Photos show whether the surface needs special cleaning.

How many coats of cold bitumen for a coastal foundation?

That depends on the surface condition and crack depth. The photos you send show the need clearly, and we will tell you how many coats suit your case before we start.

What decides the cost of cold bitumen waterproofing?

The area to be waterproofed, its condition regarding cracks and moisture, whether tiles need lifting or prior treatment is needed, ease of access, and whether a protective layer is required. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Do you offer cold bitumen waterproofing in Al Bahar (near Al Khobar)?

Yes. Al Bahar (near Al Khobar) is within our service area in the Eastern Province, and we also work in Ar Rakah Al Janubiyah, As Sadafah (near Al Khobar) and Ar Rawabi (near Al Khobar). Call us or send photos of the spot on WhatsApp.

Does cold bitumen need a protective layer on a roof?

On surfaces exposed to direct sun, yes. Intense heat and ultraviolet light damage bare cold bitumen over time. A suitable protective layer, tiles or a thermal coating is added on top, depending on the roof and how it is used. In foundations and bathrooms that will be finished over, no extra protection is needed because the coating will be covered.

Can cold bitumen be applied to freshly poured concrete?

It is not applied immediately after pouring. The concrete must complete its cure and dry fully first. Internally damp concrete prevents the coating from bonding and traps moisture beneath it, reducing how well the layer works. Send a photo and tell us when the concrete was poured and we will advise the right time to apply.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Ar Rakah Al Janubiyah, As Sadafah (near Al Khobar) and Ar Rawabi (near Al Khobar).

Other services in the area

More services in Al Bahar (near Al Khobar)

Worker rolling the white insulation layer onto a roof

Tell us about your site in Al Bahar (near Al Khobar)
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp