Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Badr

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Badr

Pool waterproofing before tiling in Al Badr begins with photos of the floor, walls, corners and joints sent by call or WhatsApp. The district contains villas with private pools and apartment buildings, where concrete condition varies with the pool's age and maintenance history. Waterproofing before tile protects the structure from seepage and internal damp.

Al Badr mixes older and newer villas with apartment buildings, some of which have pools. Newer pools may only need simple treatment of small gaps at joints, while older ones may show wider cracks and small leaks around pipes. Intense summer heat and humidity stress the exposed concrete surface. Proper treatment before tiling ensures the tile stays stable and stops damp from moving beneath the surface.

  • Al Badr is a residential district in the Eastern Province, close to Al Bustan One, Inak and Qurtubah.
  • Joints between concrete slabs and cracks around pipes are common pathways for water seepage if not sealed with proper waterproofing.
What the service includes

The scope of the work in Al Badr

  • Cleaning the surface and removing casting residue and dust
  • Applying the waterproof layer across the floor, walls and pool rim
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
How we work

How we carry out pool waterproofing before tiling in Al Badr

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Al Badr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Badr comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing before tiling in Al Badr

How long after treatment can tile be laid on a pool in Al Badr?

That depends on the treatment type, heat and humidity. The photos and initial assessment will determine the treatment method and when the surface is ready for tile. We will tell you the time needed once we see the condition.

Does treating a pool before tiling protect against water seeping through the walls too?

Yes, treatment covers the floor, walls, corners and all joints. Cracks in the concrete and gaps at joints are the main seepage paths in both walls and floor, so treating them together protects the whole structure.

Is Al Badr within your service area?

Yes, Al Badr is one of the areas we work in, as are Al Bustan One, Inak and Qurtubah (near Inak). To start, call us or message us on WhatsApp.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Badr, the same service is available in Al Bustan One, Inak and Qurtubah (near Inak).

Other services in the area

More services in Al Badr

Mosaic-tiled seaside pool

Your first step in Al Badr:
a call or a WhatsApp message

Describe the problem and where it is in Al Badr, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp