Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Aqiq (near Dhahran)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Aqiq (near Dhahran)

Pool waterproofing before tiling in Al Aqiq starts with photos of the basin and its joints, sent by call or WhatsApp. Al Aqiq lies near Al Loaloa, Al Durra and Al Murjan, and includes homes and compounds with concrete pools of different ages.

Al Aqiq has pools of varying ages: older ones often show gaps where the walls meet the floor, while newer ones sometimes only need waterproofing before tiling. Corners, joints and inlets are treated before the final layer goes on, and pipe outlets are covered with a suitable material. The photos show which case applies to your basin.

  • Al Aqiq is a district in the Eastern Province near Al Loaloa, Al Durra and Al Murjan, with homes and compounds.
  • The wall-to-floor junction in older pools is the spot most in need of treatment before tiling.
What the service includes

What the service covers in Al Aqiq (near Dhahran)

  • Closing feed and drain pipe inlets and light fitting openings
  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
  • Checking the layer is complete before tiling is allowed to begin
How we work

This is how we work in Al Aqiq (near Dhahran)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Al Aqiq (near Dhahran) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Pool waterproofing before tiling in Al Aqiq (near Dhahran)We choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Aqiq (near Dhahran)

Do older pools in Al Aqiq need waterproofing before tiling?

Usually yes, since gaps build up at corners and joints over time. The photos will show whether the concrete is sound before work begins.

Does waterproofing differ between newer and older pools in Al Aqiq?

Yes, older pools often need cracks treated before tiling, while newer ones may only need the waterproofing layer. The photos determine which applies.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Do you cover Al Aqiq (near Dhahran)?

Yes. We serve Al Aqiq (near Dhahran) and nearby areas such as Al Loaloa (near Dhahran), Al Durra (near Ghunan) and Al Murjan (near Dhahran), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Pool waterproofing before tiling near Al Aqiq (near Dhahran)

If the site is outside Al Aqiq (near Dhahran), the same service is available in Al Loaloa (near Dhahran), Al Durra (near Ghunan) and Al Murjan (near Dhahran).

Other services in the area

More services in Al Aqiq (near Dhahran)

Mosaic-tiled seaside pool

Your first step in Al Aqiq (near Dhahran):
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp