
Pool waterproofing before tiling in Al Murjan (near Dhahran)
Pool waterproofing before tiling in Al Murjan begins with WhatsApp photos of the floor, joints and corners. The district is near Half Moon Beach and has villas, blocks and private pools and water courts, each needing special sealing before tiling.
Al Murjan is known for modern pools in villas, blocks and water courts, and its closeness to the sea means constant exposure to moisture and salt in the air. Newly poured pool concrete often shows internal moisture and hairline cracks, especially at joints between the pool floor, walls and pipe entries. Treating these areas before tiling stops water leaking from under the outer layer. Tiles bonded to properly treated concrete last longer and do not crack from movement.
- Al Murjan is a district in the Eastern Province, close to Half Moon Beach, Al Loaloa and Al Kawthar, with modern pools and water facilities.
- Pools near the coast face high humidity and airborne salt, so concrete must be sealed comprehensively before tiling.
The scope of the work in Al Murjan (near Dhahran)
- Applying the waterproof layer across the floor, walls and pool rim
- Checking the layer is complete before tiling is allowed to begin
- Closing feed and drain pipe inlets and light fitting openings
- Treating corners and pour joints with a suitable compound
From first contact to the finished job in Al Murjan (near Dhahran)
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Start from Al Murjan (near Dhahran) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve Al Murjan (near Dhahran) and around itIncluding Half Moon Beach, Al Loaloa (near Dhahran) and Al Kawthar (near Dhahran), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about pool waterproofing before tiling in Al Murjan (near Dhahran)
Does sea salt affect pool concrete before tiling?
Yes, salt and moisture penetrate concrete and cause erosion and cracking. Treating concrete and joints before tiling stops this effect. Send photos of the pool and its surroundings so we can assess exposure levels.
How often does pool concrete need treatment in coastal areas?
One thorough treatment before tiling is sufficient if done correctly. Photos you send show the concrete condition and any cracks, and we determine the treatment level needed from that.
Does the surface have to be dry before the waterproof layer goes on?
It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.
What decides the cost of waterproofing a pool before tiling?
The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
Is Al Murjan (near Dhahran) within your service area?
Yes, Al Murjan (near Dhahran) is one of the areas we work in, as are Half Moon Beach, Al Loaloa (near Dhahran) and Al Kawthar (near Dhahran). To start, call us or message us on WhatsApp.
Pool waterproofing before tiling near Al Murjan (near Dhahran)
We also offer pool waterproofing before tiling in Half Moon Beach, Al Loaloa (near Dhahran) and Al Kawthar (near Dhahran), among the closest areas to Al Murjan (near Dhahran).
More services in Al Murjan (near Dhahran)


