
Pool waterproofing after tiling in Juba District
Pool waterproofing after tiling in Juba District begins with a photo of the pool sent by call or WhatsApp. The district contains villas and apartment blocks, many with pools in yards or below roofs, and leaks often appear at tile joints and corners.
Juba District has villas of varying sizes and old and new apartment blocks, many with pools of different depths and dimensions. A tiled pool faces constant pressure from water and sun, so leaks emerge at joints between tiles and around drain and inlet pipes. The leak may come from tiny cracks in the cement or slight tile movement; if the tiles themselves are sound, waterproofing keeps water in without removing them. Photos pinpoint the leak and guide the best repair method.
- Juba District is a district in Riyadh, close to Al Mirqab, Ladhah and Al Marbidia districts, with villas and residential apartment blocks.
- Tiled pools in residential areas face temperature and humidity swings that can cause cracking in the joints.
The scope of the work in Juba District
- Closing pump, light and return fittings from inside
- Injecting cracks with a compound suited to the concrete shell
- Watching the water level after filling to confirm the leak is closed
- Lifting damaged tiles and rebuilding the layer behind them where needed
How we carry out pool waterproofing after tiling in Juba District
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.
Start from Juba District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Juba District comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Juba District
Must the tiles be removed to fix a leak in Juba District?
Not always. If cracks are in the joints and cement, the leak can be treated from the surface without removing tiles. But photos show the pool's condition and whether the tiles themselves are broken.
How long does it take to waterproof a tiled pool in Juba District?
That depends on where the leak is, the pool's size and the damage's extent. The photos and first call help us understand the situation better to plan the work with you.
What decides the cost of waterproofing a pool after tiling?
The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.
Do you offer pool waterproofing after tiling in Juba District?
Yes. Juba District is within our service area in the Eastern Province, and we also work in Al Mirqab District, Ladhah District and Al Marbidia District. Call us or send photos of the spot on WhatsApp.
Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?
In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.
Does the pool have to be emptied before the leak is found?
Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.
We also offer it in neighbouring areas
We also work near Juba District, in Al Mirqab District, Ladhah District and Al Marbidia District.
More services in Juba District


