
Cementitious pool waterproofing in Juba District
Cementitious pool waterproofing in Juba District begins with photos of the pool from various sides, sent by call or WhatsApp. The district has villas and residential buildings with pools showing signs of damage or leaking.
Pools in Juba District range from small villas pools to larger ones in shared yards of apartment buildings. Concrete in older pools is prone to cracks and peeling from years of intense heat and water exposure. Old cementitious coating loses flexibility and leaks, especially at joints and around pipe openings. Reapplying flexible cementitious coating restores protection and stops damage spreading. Send photos of suspect areas for accurate assessment.
- Juba District is a residential district in the Eastern Province, near Al Mirqab, Ladhah and Al Marbidia, with varied villas and apartment buildings.
- Pools in shared yards and villas face constant pressure from water and daily heat, which accelerates coating deterioration.
The cementitious pool waterproofing work in Juba District
- Wet curing after application so the coating sets correctly
- Cleaning the concrete surface and removing any adhesive residue or dust
- Closing return pipe openings and drain outlets before the coating goes on
- Checking the pool walls and floor and locating cracks and openings
The steps of cementitious pool waterproofing in Juba District
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.
We serve Juba District and around itIncluding Al Mirqab District, Ladhah District and Al Marbidia District, as part of our work across the Eastern Province.
Your request from Juba District comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Common questions on cementitious pool waterproofing in Juba District
How do we know pool cementitious coating needs complete renewal?
Widespread peeling, scattered cracks, or continuous leaking indicate full renewal is needed. Coating that has faded or begun separating from concrete cannot protect the pool. Your photos will show the coating's condition and whether renewal is necessary.
Does treating pool cracks stop leaking permanently?
Treating cracks and proper application of flexible cementitious coating stop leaking, but this depends on concrete condition and correct application. Photos help us assess success likelihood and the right method.
Do you offer cementitious pool waterproofing in Juba District?
Yes. Juba District is within our service area in the Eastern Province, and we also work in Al Mirqab District, Ladhah District and Al Marbidia District. Call us or send photos of the spot on WhatsApp.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
What decides the cost of cementitious pool waterproofing?
The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.
Why is the cementitious coating kept moist after it is applied?
Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.
The same service in nearby areas
We also offer cementitious pool waterproofing in Al Mirqab District, Ladhah District and Al Marbidia District, among the closest areas to Juba District.
More services in Juba District

