Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Az Zahra

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Az Zahra

We treat leaks in tiled pools in the Az Zahra district of the Eastern Province, beginning by locating the source of the leak before sealing the joints, cracks and fittings. Send photos by call or WhatsApp and we will assess the case with you.

Az Zahra is largely made up of villas and homes with gardens, where private pools are common in back yards. Pools here face wide swings between daytime and night-time temperatures, which move the joints and bring out cracks at the edge and in the corners. The photos show in each case whether the source lies in the tiling or in what surrounds it.

  • Az Zahra is a residential district in the Eastern Province, lying near Al Jawahir, Al Wurud and An Narjis.
  • A tiled pool in an open yard expands and contracts with temperature, gradually moving its joints.
What the service includes

The pool waterproofing after tiling work in Az Zahra

  • Watching the water level after filling to confirm the leak is closed
  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Testing the leak area with dye and pressure-checking the lines
  • Closing pump, light and return fittings from inside
How we work

The steps of pool waterproofing after tiling in Az Zahra

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

Az Zahra is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Az Zahra and around itIncluding Al Jawahir, Al Wurud (near Tarout) and An Narjis, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing after tiling in Az Zahra

Does the heat in the Eastern Province cause tiled pools in Az Zahra to leak?

Intense heat and the day-to-night swing move joints and expose existing weaknesses, but the exact cause is determined from the photos and inspection in each case.

Can a pool in a back yard be repaired without disrupting the whole garden?

Usually yes, since most repairs focus on the edge, joints and fittings. The photos define the area affected before we agree a plan of work.

Do you offer pool waterproofing after tiling in Az Zahra?

Yes. Az Zahra is within our service area in the Eastern Province, and we also work in Al Jawahir, Al Wurud (near Tarout) and An Narjis. Call us or send photos of the spot on WhatsApp.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?

In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Nearby areas

Pool waterproofing after tiling near Az Zahra

Nearby areas we also cover: Al Jawahir, Al Wurud (near Tarout) and An Narjis.

Other services in the area

More services in Az Zahra

Pool at night with water jets after waterproofing

Your first step in Az Zahra:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp