
Pool waterproofing after tiling in As Sunaidah District
Pool waterproofing after tiling in As Sunaidah District begins with a photo of the pool sent by WhatsApp or call. Cracked tiles and weak joints let water seep beneath the pool, and waterproofing treats the cracks and seals directly from above the tiles.
As Sunaidah District is a residential neighbourhood with villas and residential buildings, some with tiled private pools. These pools face direct sun and humidity, so concrete and tiles crack from seasonal expansion and contraction. Joints between tiles, walls and corners are the weakest spots, and water leaking from them saturates the concrete and foundation with moisture. Treating cracks and joints with flexible materials stops the leak and protects the concrete from further damage.
- As Sunaidah District is in the Eastern Province between Munifah, Ar Rafiah and Al Marbidia districts, with villas and residential buildings.
- Small pools in villas leak first from corners because they bear concentrated pressure from two directions.
The scope of the work in As Sunaidah District
- Closing pump, light and return fittings from inside
- Lifting damaged tiles and rebuilding the layer behind them where needed
- Resealing joints with a flexible water-resistant compound
- Watching the water level after filling to confirm the leak is closed
This is how we work in As Sunaidah District
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.
Your request from As Sunaidah District comes to usCall or WhatsApp on one number, and we answer you ourselves.
Start from As Sunaidah District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Common questions on pool waterproofing after tiling in As Sunaidah District
Can we tell whether a pool leak is from the walls or the floor?
Water appearing above the foundation or on outer walls suggests wall leaks, while rapid water loss without visible outer dampness indicates floor leaks. Photos reveal the signs.
Does treating a leak require draining the entire pool?
Not always. Some joints and cracks can be treated while water is in the pool, but others may need partial draining. Photos determine whether draining is necessary.
Do you cover As Sunaidah District?
Yes. We serve As Sunaidah District and nearby areas such as Munifah District, Ar Rafiah District and Al Marbidia District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
What is the difference between resealing joints and injecting cracks in a pool?
A joint is the line between two tiles or between a tile and a fitting, and it is resealed with a flexible water-resistant compound that tolerates shell movement. A crack is a break in the concrete or render behind the tile, and it is injected with a compound that fills the void and stops it spreading. The source determines which treatment is used.
Can the pool be used straight after treatment?
No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.
Does the pool have to be emptied before the leak is found?
Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.
The same service in nearby areas
Nearby areas we also cover: Munifah District, Ar Rafiah District and Al Marbidia District.
More services in As Sunaidah District


